Skip to Main Content
Search distributed energy resources in New York

Triboro Center

Overview Centers - Triboro/DOJ

The facility monthly summary plot page shows electric generation from all DER projects in the facility, and utility import data if available. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for different dates, select your desired date range and press “Go”.

To download data used to create the monthly summary plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The facility monthly summary table shows electric generation from all DER projects in the facility, and utility import and facility electric load data if available.

To view data for different dates, select your desired date range and press “Go”.

To download data from the monthly summary table in CSV format, press the download button to the top right of the table.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Summary Table

Feb 2024 to Jul 2025
Electric Generation (kWh) Electric Utility Import (kWh) Facility Electric Load (kWh)
Total 723,367 723,367
Feb 2024
22,707 22,707
Mar 2024
57,345 57,345
Apr 2024
33,034 33,034
May 2024
51,137 51,137
Jun 2024
42,013 42,013
Jul 2024
92,035 92,035
Aug 2024
36,172 36,172
Sep 2024
20,109 20,109
Oct 2024
36,265 36,265
Nov 2024
47,853 47,853
Dec 2024
64,107 64,107
Jan 2025
61,973 61,973
Feb 2025
54,195 54,195
Mar 2025
43,150 43,150
Apr 2025
23,140 23,140
May 2025
9,466 9,466
Jun 2025
11,231 11,231
Jul 2025
17,434 17,434

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The facility time series page shows electric generation from all DER projects in the facility. If available, utility import data is stacked on top to show total facility use. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for another date range or time step, select your desired months and time step and press “Go”. Due to performance constraints, hourly data may only be displayed within a date range of up to one month in length.

To download data used to create the time series plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Times are shown in Eastern Time (ET) and are adjusted to reflect Daylight Saving Time (DST).

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.