Triboro Center
This page shows facility, project, and distributed energy resource details. Click on the solid bars to show or hide details.
This page shows facility, project, and distributed energy resource details. Click on the solid bars to show or hide details.
Facility Details
| Category | Health Care (Inpatient): Inpatient Rehabilitation |
|---|---|
| Electric Utility | Consolidated Edison |
| Gas Utility | Consolidated Edison |
| NYISO Zone | J - New York City |
-
Program CHP Developer/Installer Aegis Energy Services, Inc. 
Data Monitoring Feb 2024 – Jul 2025 NYSERDA Contract Name Centers - Triboro/DOJ Contracted Capacity 400 kW ConEd Target Zone NYSERDA-funded Heat Recovery Loads Met Domestic Hot Water (DHW), Space Heating, Absorption Chiller Project Documentation
-
Unit Manufacturer Aegenco Unit Model PowerVerter 100 Elec. Gen. Rating per Unit 100 kW Thermal Gen. Rating per Unit 643.2 MBtu/h No. of Units 4 No. of Prime Movers 4 Primary Fuel Natural Gas Prime Mover Reciprocating Engine Location Indoor - Basement Generator Inverter Chiller Hot Water Driven Rated Electric Efficiency (% HHV) 25.2 Rated CHP Efficiency (% HHV) 76.9
-