Feb 2019 to Mar 2023
1,426
MWh
electricity generated
Capacity
Factor
18,598
Mcf
generator fuel consumed
Electric
Efficiency
9,778
MMBtu
heat used
Thermal
Efficiency
CHP
Efficiency

The project monthly summary table provides measured data and key performance indicators for the DER project.

To view data for another date range, select your desired months and press “Go”.

To download data from the monthly summary table in CSV format, press the download button to the top right of the table.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Summary Table

Feb 2019 to Mar 2023
Electricity Generated (kWh) Total Fuel Consumed (cf) Total Heat Used (MBtu) Heat Rejected (MBtu) Capacity Factor (%) Electric Efficiency (% HHV) Thermal Efficiency (% HHV) CHP Efficiency (% HHV)
Total 1,426,194 18,597,518 9,778,191 0 39.3 25.4 50.9 76.3
Feb 2019
39,187 519,667 290,989 0 58.4 24.9 54.3 79.2
Mar 2019
50,557 685,852 378,491 0 68.0 24.4 53.5 77.9
Apr 2019
42,306 583,158 317,620 0 58.8 24.0 52.8 76.8
May 2019
45,570 618,036 330,335 0 61.3 24.4 51.8 76.2
Jun 2019
40,982 563,459 301,951 0 56.9 24.1 51.9 76.0
Jul 2019
35,494 491,364 261,130 0 47.7 23.9 51.5 75.4
Aug 2019
33,375 465,300 244,980 0 44.9 23.7 51.0 74.7
Sep 2019
32,814 452,955 234,601 0 45.6 24.0 50.2 74.1
Oct 2019
36,003 492,336 255,930 0 50.0 24.2 50.4 74.6
Nov 2019
37,397 507,865 260,056 0 57.7 24.4 49.6 74.0
Dec 2019
46,851 633,845 322,448 0 63.0 24.4 49.3 73.7
Jan 2020
47,673 647,873 329,586 0 64.1 24.3 49.3 73.6
Feb 2020
32,192 431,988 218,185 0 46.3 24.6 48.9 73.6
Mar 2020
48,958 620,000 307,880 0 65.8 26.1 48.1 74.2
Apr 2020
47,945 620,867 307,769 0 66.6 25.5 48.0 73.6
May 2020
48,570 650,282 329,884 0 65.3 24.7 49.2 73.9
Jun 2020
40,545 560,700 287,642 0 56.3 23.9 49.7 73.6
Jul 2020
44,290 572,636 289,768 0 59.5 25.6 49.0 74.6
Aug 2020
45,013 581,200 293,918 0 60.5 25.6 49.0 74.6
Sep 2020
30,412 392,100 195,526 0 42.2 25.7 48.3 74.0
Oct 2020
45,820 589,800 294,000 0 61.6 25.7 48.3 74.0
Nov 2020
47,990 613,900 306,514 0 66.7 25.9 48.4 74.2
Dec 2020
49,439 636,400 313,329 0 66.4 25.7 47.7 73.4
Jan 2021
48,870 630,600 310,360 0 65.7 25.6 47.7 73.3
Feb 2021
41,658 532,400 264,354 0 62.0 25.9 48.1 74.0
Mar 2021
50,714 652,600 325,856 0 68.2 25.7 48.4 74.1
Apr 2021
31,565 404,744 202,724 0 43.8 25.8 48.5 74.3
May 2021
43,208 552,656 286,161 0 58.1 25.9 50.2 76.0
Jun 2021
45,379 589,170 308,471 0 63.0 25.5 50.7 76.2
Jul 2021
44,721 581,816 323,390 0 60.1 25.4 53.9 79.3
Aug 2021
40,319 577,899 319,807 0 54.2 23.1 53.6 76.7
Sep 2021
13,817 181,295 111,270 0 19.2 25.2 59.5 84.7
Oct 2021
5,587 43,893 41,542 0 7.5 42.1 91.7 133.8
Nov 2021
0 0 0 0 0.0 0.0 0.0 0.0
Dec 2021
0 0 0 0 0.0 0.0 0.0 0.0
Jan 2022
0 0 0 0 0.0 0.0 0.0 0.0
Feb 2022
896 6,676 6,937 0 1.3 44.4 100.7 145.1
Mar 2022
0 0 0 0 0.0 0.0 0.0 0.0
Apr 2022
0 0 0 0 0.0 0.0 0.0 0.0
May 2022
0 0 0 0 0.0 0.0 0.0 0.0
Jun 2022
5,006 36,664 35,533 0 7.0 45.2 93.9 139.1
Jul 2022
6,193 78,193 43,073 0 8.3 26.2 53.4 79.6
Aug 2022
1,510 5,900 10,410 0 2.0 84.7 171.0 255.6
Sep 2022
0 0 0 0 0.0 0.0 0.0 0.0
Oct 2022
0 0 0 0 0.0 0.0 0.0 0.0
Nov 2022
0 0 0 0 0.0 0.0 0.0 0.0
Dec 2022
3,198 14,264 21,474 0 4.3 74.2 145.9 220.0
Jan 2023
17,176 136,824 116,067 0 23.1 41.5 82.2 123.7
Feb 2023
25,222 261,888 169,834 0 37.5 31.9 62.8 94.7
Mar 2023
31,771 378,456 208,394 0 42.7 27.8 53.4 81.1

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

Data Displayed:

The monthly summary plot shows monthly sums of measured data and monthly averages of key performance indicators.

To view data for another date range, select your desired months and press “Go”.

To download data used to create the monthly summary plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Click on legend entries below the plot, if present, to show or hide data.

Data Displayed

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

Data Displayed:

The time series plot shows averages of measured data and key performance indicators. The plot can be switched between the daily and hourly time steps, to adjust the level of averaging displayed.

To view data for another date range or time step, select your desired dates and time step and press “Go”. Due to performance constraints, hourly data may only be displayed within a date range of up to one month in length.

To download data used to create the time series plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Click on legend entries below the plot, if present, to show or hide data.

Data Displayed

Times are shown in Eastern Time (ET) and are adjusted to reflect Daylight Saving Time (DST).

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

Data Displayed:

The ambient temperature plot shows averages of measured data and key performance indicators versus ambient temperature.

To view data for another date range or time step, select your desired dates and time step and press “Go”. Due to performance constraints, hourly data may only be displayed within a date range of up to one month in length.

To download data used to create the ambient temperature plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Click on legend entries below the plot, if present, to show or hide data.

Data Displayed
Ambient Temperature data provided by NOAA at weather.govLink opens in new window - close new window to return to this page.

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The project performance benchmark page shows how the DER project performs compared to similar-sized projects using the same technology in the same facility category. The key performance index used for benchmarking can be changed by selecting the desired rating from the table headings at the bottom of the page. Clicking on each result in the distribution will bring up the name and link to other related facilities.

To view data for another date range, select your desired months and press “Go”.

Note that benchmarking only occurs on data with automated data filtering on, to ensure consistent ranking results.

CHP
Efficiency
Thermal
Efficiency
Electric
Efficiency
Capacity
Factor
Electric
Generation
Luna Park Apartments - Building 3 76.3 % 50.9 % 25.4 % 39.3 % 1,426 MWh
Top Peer 87.4 % 58.2 % 29.2 % 54.8 % 91 MWh
Average Peer 58.0 % 35.3 % 22.7 % 34.1 % 1,006 MWh

Peer Criteria

  • Technology: CHP
  • Generation Capacity: Small (0-250 kW)
  • Facility Category: Residential
  • Total Peers in Group: 94

The project monthly CHP performance rating plot shows overall CHP performance and highlights periods for potential performance improvement.

To view data for another date range, select your desired months and press “Go”.

To download data used to create the monthly CHP performance rating plot in CSV format, press the download button to the top right of the chart.

Note that rating only occurs on data with automated data filtering on, to ensure consistent ranking results.

The peak demand reduction shows the contribution of the CHP system to reducing the utility grid peak demand, and other calculations that were utilized in previous NYSERDA CHP performance programs. The peak demand reduction (kWP) is defined as the average CHP output during the period spanning May 1 through October 31, Monday through Friday, 12:00 Noon to 6:00 PM. Federal holidays are excluded from this period.

The total generation (kWhA) is defined as the total net CHP generation during the period evaluated.

The two CHP efficiencies (FCECHP) are program specific, and differ slightly from the conventional CHP efficiency.

The 2013 CHP systems manual defines FCECHP as the combined net electrical and useful heat recovery divided by the fuel input at 1,032 BTU/CF HHV, however the useful heat recovery is divided by a displaced boiler efficiency of 80%.

The 2010 CHP systems manual defines FCECHP as the combined net electrical and useful heat recovery divided by the fuel input at 928 BTU/CF LHV. No displaced boiler efficiency is assumed in the FCECHP calculation.

CHP Performance Program Metrics

Feb 2019 to Mar 2023
Peak Demand Reduction (kWP)
61
kW
Total Generation (kWhA)
1,426,194
kWh
Heat Recovered
9,778
MMBtu
Gas Consumed
18,598
Mcf
FCECHP

FCECHP 2013 =
[(WG × 3.413) + (QU / 0.8)] / [FG × 1.032]

89.0
% HHV
FCECHP

FCECHP 2006–2010 =
[(WG × 3.413) + QU] / [FG × 0.928]

84.8
% LHV

Use this page to download all measured performance data for a DER project in CSV format. Select your desired date range and time step, then press the “Download” button to save the data file to your computer.

Download Data

To download performance data, select your desired date range and time step, then click the Download button.

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.