ClearPath Energy - 526 State Route 170A

Overview ClearPath Energy LLC - 526 State Route 170A - PV Systems

The project snapshot page provides a quick overview of the performance of the DER project. Hover over individual key performance indicators to see a definition.

Performance Snapshot

Mar 2023 to Apr 2026
28,835
MWh
electricity generated
Capacity
Factor

The project monthly summary table provides measured data and key performance indicators for the DER project.

To view data for another date range, select your desired months and press “Go”.

To download data from the monthly summary table in CSV format, press the download button to the top right of the table.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Summary Table

Mar 2023 to Apr 2026
Electricity Generated (MWh) Capacity Factor (%)
Total 28,835 14.1
Mar 2023
89 4.5
Apr 2023
860 15.7
May 2023
1,531 27.0
Jun 2023
1,077 19.6
Jul 2023
1,309 23.1
Aug 2023
1,086 19.1
Sep 2023
1,015 18.5
Oct 2023
704 12.4
Nov 2023
488 8.9
Dec 2023
231 4.1
Jan 2024
243 4.3
Feb 2024
757 14.3
Mar 2024
756 13.3
Apr 2024
885 16.1
May 2024
869 15.3
Jun 2024
1,247 22.7
Jul 2024
1,386 24.4
Aug 2024
744 13.1
Sep 2024
712 13.0
Oct 2024
890 15.7
Nov 2024
503 9.2
Dec 2024
194 3.4
Jan 2025
392 6.9
Feb 2025
182 3.5
Mar 2025
880 15.5
Apr 2025
353 6.4
May 2025
900 15.9
Jun 2025
1,166 21.3
Jul 2025
1,449 25.5
Aug 2025
1,451 25.6
Sep 2025
1,177 21.5
Oct 2025
913 16.1
Nov 2025
346 6.3
Dec 2025
209 3.7
Jan 2026
211 3.7
Feb 2026
198 6.8
Mar 2026
732 14.8
Apr 2026
699 12.7

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

Data Displayed:

The monthly summary plot shows monthly sums of measured data and monthly averages of key performance indicators.

To view data for another date range, select your desired months and press “Go”.

To download data used to create the monthly summary plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Click on legend entries below the plot, if present, to show or hide data.

Data Displayed

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

Data Displayed:

The time series plot shows averages of measured data and key performance indicators. The plot can be switched between the daily and hourly time steps, to adjust the level of averaging displayed.

To view data for another date range or time step, select your desired dates and time step and press “Go”. Due to performance constraints, hourly data may only be displayed within a date range of up to one month in length.

To download data used to create the time series plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Click on legend entries below the plot, if present, to show or hide data.

Data Displayed

Times are shown in Eastern Time (ET) and are adjusted to reflect Daylight Saving Time (DST).

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

Data Displayed:

The ambient temperature plot shows averages of measured data and key performance indicators versus ambient temperature.

To view data for another date range or time step, select your desired dates and time step and press “Go”. Due to performance constraints, hourly data may only be displayed within a date range of up to one month in length.

To download data used to create the ambient temperature plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Click on legend entries below the plot, if present, to show or hide data.

Data Displayed
Ambient Temperature data provided by NOAA at weather.govLink opens in new window - close new window to return to this page.

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The project performance benchmark page shows how the DER project performs compared to similar-sized projects using the same technology in the same facility category. The key performance index used for benchmarking can be changed by selecting the desired rating from the table headings at the bottom of the page. Clicking on each result in the distribution will bring up the name and link to other related facilities.

To view data for another date range, select your desired months and press “Go”.

Note that benchmarking only occurs on data with automated data filtering on, to ensure consistent ranking results.

Capacity
Factor
Electric
Generation
ClearPath Energy - 526 State Route 170A 14.1 % 28,835 MWh
Top Peer 21.2 % 761 MWh
Average Peer 11.9 % 9,456 MWh

Peer Criteria

  • Technology: Solar PV
  • Generation Capacity: Large (1000+ kW)
  • Facility Category: Offsite Resource
  • Total Peers in Group: 834

Use this page to download all measured performance data for a DER project in CSV format. Select your desired date range and time step, then press the “Download” button to save the data file to your computer.

Download Data

To download performance data, select your desired date range and time step, then click the Download button.

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.