Overview City of Tonawanda Landfill - 68354

The facility monthly summary plot page shows electric generation from all DER projects in the facility, and utility import data if available. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for different dates, select your desired date range and press “Go”.

To download data used to create the monthly summary plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The facility monthly summary table shows electric generation from all DER projects in the facility, and utility import and facility electric load data if available.

To view data for different dates, select your desired date range and press “Go”.

To download data from the monthly summary table in CSV format, press the download button to the top right of the table.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Summary Table

Jul 2019 to Oct 2024
Electric Generation (kWh) Electric Utility Import (kWh) Facility Electric Load (kWh)
Total 5,042,429 5,042,429
Jul 2019
79,067 79,067
Aug 2019
121,100 121,100
Sep 2019
97,007 97,007
Oct 2019
73,431 73,431
Nov 2019
34,473 34,473
Dec 2019
29,063 29,063
Jan 2020
28,478 28,478
Feb 2020
43,532 43,532
Mar 2020
76,289 76,289
Apr 2020
89,736 89,736
May 2020
107,539 107,539
Jun 2020
140,451 140,451
Jul 2020
129,467 129,467
Aug 2020
121,872 121,872
Sep 2020
102,951 102,951
Oct 2020
65,276 65,276
Nov 2020
51,069 51,069
Dec 2020
24,851 24,851
Jan 2021
22,062 22,062
Feb 2021
46,699 46,699
Mar 2021
105,530 105,530
Apr 2021
97,649 97,649
May 2021
117,076 117,076
Jun 2021
124,571 124,571
Jul 2021
103,640 103,640
Aug 2021
116,060 116,060
Sep 2021
96,804 96,804
Oct 2021
57,306 57,306
Nov 2021
49,962 49,962
Dec 2021
27,582 27,582
Jan 2022
28,566 28,566
Feb 2022
47,474 47,474
Mar 2022
77,976 77,976
Apr 2022
95,444 95,444
May 2022
113,231 113,231
Jun 2022
119,506 119,506
Jul 2022
121,348 121,348
Aug 2022
103,858 103,858
Sep 2022
79,123 79,123
Oct 2022
78,513 78,513
Nov 2022
46,691 46,691
Dec 2022
23,458 23,458
Jan 2023
15,759 15,759
Feb 2023
54,513 54,513
Mar 2023
74,761 74,761
Apr 2023
101,967 101,967
May 2023
130,946 130,946
Jun 2023
102,974 102,974
Jul 2023
115,158 115,158
Aug 2023
101,403 101,403
Sep 2023
99,969 99,969
Oct 2023
60,550 60,550
Nov 2023
46,408 46,408
Dec 2023
23,853 23,853
Jan 2024
14,370 14,370
Feb 2024
62,494 62,494
Mar 2024
53,801 53,801
Apr 2024
84,427 84,427
May 2024
118,020 118,020
Jun 2024
104,135 104,135
Jul 2024
120,790 120,790
Aug 2024
100,468 100,468
Sep 2024
95,130 95,130
Oct 2024
44,748 44,748

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The facility time series page shows electric generation from all DER projects in the facility. If available, utility import data is stacked on top to show total facility use. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for another date range or time step, select your desired months and time step and press “Go”. Due to performance constraints, hourly data may only be displayed within a date range of up to one month in length.

To download data used to create the time series plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Times are shown in Eastern Time (ET) and are adjusted to reflect Daylight Saving Time (DST).

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.