Skip to Main Content
Search distributed energy resources in New York

ACM Medical Laboratory

Overview ACM Medical Laboratory

The facility monthly summary plot page shows electric generation from all DER projects in the facility, and utility import data if available. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for different dates, select your desired date range and press “Go”.

To download data used to create the monthly summary plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

NYSERDA requires projects to submit performance data for up to three years. This project has exceeded its required monitoring period, and NYSERDA is no longer gathering project performance data. Solar projects have an expected lifespan of at least 25 years, and energy storage projects have an expected lifespan of at least 10 to 15 years. For more information about the current status of this project, please contact the project owner.

The facility monthly summary table shows electric generation from all DER projects in the facility, and utility import and facility electric load data if available.

To view data for different dates, select your desired date range and press “Go”.

To download data from the monthly summary table in CSV format, press the download button to the top right of the table.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Summary Table

Sep 2017 to Mar 2023
Electric Generation (kWh) Electric Utility Import (kWh) Facility Electric Load (kWh)
Total 2,180,601 — 2,180,601
Sep 2017
2,413 — 2,413
Oct 2017
38,017 — 38,017
Nov 2017
15,778 — 15,778
Dec 2017
5,915 — 5,915
Jan 2018
8,293 — 8,293
Feb 2018
14,675 — 14,675
Mar 2018
29,240 — 29,240
Apr 2018
44,215 — 44,215
May 2018
73,053 — 73,053
Jun 2018
67,227 — 67,227
Jul 2018
72,169 — 72,169
Aug 2018
53,288 — 53,288
Sep 2018
43,036 — 43,036
Oct 2018
24,724 — 24,724
Nov 2018
10,375 — 10,375
Dec 2018
6,083 — 6,083
Jan 2019
7,142 — 7,142
Feb 2019
12,458 — 12,458
Mar 2019
33,829 — 33,829
Apr 2019
47,946 — 47,946
May 2019
53,436 — 53,436
Jun 2019
60,398 — 60,398
Jul 2019
55,932 — 55,932
Aug 2019
61,796 — 61,796
Sep 2019
45,407 — 45,407
Oct 2019
33,672 — 33,672
Nov 2019
10,282 — 10,282
Dec 2019
6,296 — 6,296
Jan 2020
4,914 — 4,914
Feb 2020
11,534 — 11,534
Mar 2020
40,834 — 40,834
Apr 2020
46,044 — 46,044
May 2020
56,871 — 56,871
Jun 2020
68,249 — 68,249
Jul 2020
63,406 — 63,406
Aug 2020
53,035 — 53,035
Sep 2020
39,701 — 39,701
Oct 2020
23,081 — 23,081
Nov 2020
14,418 — 14,418
Dec 2020
5,633 — 5,633
Jan 2021
4,447 — 4,447
Feb 2021
2,151 — 2,151
Mar 2021
39,261 — 39,261
Apr 2021
36,224 — 36,224
May 2021
50,497 — 50,497
Jun 2021
58,139 — 58,139
Jul 2021
49,297 — 49,297
Aug 2021
53,549 — 53,549
Sep 2021
37,768 — 37,768
Oct 2021
20,304 — 20,304
Nov 2021
13,967 — 13,967
Dec 2021
6,042 — 6,042
Jan 2022
1,235 — 1,235
Feb 2022
4,332 — 4,332
Mar 2022
23,541 — 23,541
Apr 2022
37,904 — 37,904
May 2022
59,386 — 59,386
Jun 2022
64,604 — 64,604
Jul 2022
72,098 — 72,098
Aug 2022
61,748 — 61,748
Sep 2022
42,592 — 42,592
Oct 2022
39,448 — 39,448
Nov 2022
22,046 — 22,046
Dec 2022
11,476 — 11,476
Jan 2023
3,729 — 3,729
Feb 2023
0 — 0
Mar 2023
0 — 0

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

NYSERDA requires projects to submit performance data for up to three years. This project has exceeded its required monitoring period, and NYSERDA is no longer gathering project performance data. Solar projects have an expected lifespan of at least 25 years, and energy storage projects have an expected lifespan of at least 10 to 15 years. For more information about the current status of this project, please contact the project owner.

The facility time series page shows electric generation from all DER projects in the facility. If available, utility import data is stacked on top to show total facility use. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for another date range or time step, select your desired months and time step and press “Go”. Due to performance constraints, hourly data may only be displayed within a date range of up to one month in length.

To download data used to create the time series plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Times are shown in Eastern Time (ET) and are adjusted to reflect Daylight Saving Time (DST).

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

NYSERDA requires projects to submit performance data for up to three years. This project has exceeded its required monitoring period, and NYSERDA is no longer gathering project performance data. Solar projects have an expected lifespan of at least 25 years, and energy storage projects have an expected lifespan of at least 10 to 15 years. For more information about the current status of this project, please contact the project owner.