Skip to Main Content
Search distributed energy resources in New York

Town of Ontario WWTP

Overview Town of Ontario WWTP

The facility monthly summary plot page shows electric generation from all DER projects in the facility, and utility import data if available. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for different dates, select your desired date range and press “Go”.

To download data used to create the monthly summary plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The facility monthly summary table shows electric generation from all DER projects in the facility, and utility import and facility electric load data if available.

To view data for different dates, select your desired date range and press “Go”.

To download data from the monthly summary table in CSV format, press the download button to the top right of the table.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Summary Table

Aug 2017 to Dec 2024
Electric Generation (kWh) Electric Utility Import (kWh) Facility Electric Load (kWh)
Total 21,287,202 21,287,202
Aug 2017
129,167 129,167
Sep 2017
339,434 339,434
Oct 2017
258,802 258,802
Nov 2017
136,706 136,706
Dec 2017
51,384 51,384
Jan 2018
93,498 93,498
Feb 2018
128,197 128,197
Mar 2018
296,572 296,572
Apr 2018
277,724 277,724
May 2018
429,824 429,824
Jun 2018
417,616 417,616
Jul 2018
447,102 447,102
Aug 2018
317,139 317,139
Sep 2018
272,515 272,515
Oct 2018
159,495 159,495
Nov 2018
85,665 85,665
Dec 2018
71,182 71,182
Jan 2019
99,896 99,896
Feb 2019
124,372 124,372
Mar 2019
185,550 185,550
Apr 2019
273,089 273,089
May 2019
341,528 341,528
Jun 2019
388,816 388,816
Jul 2019
429,180 429,180
Aug 2019
390,156 390,156
Sep 2019
336,179 336,179
Oct 2019
229,343 229,343
Nov 2019
111,767 111,767
Dec 2019
71,156 71,156
Jan 2020
86,266 86,266
Feb 2020
119,604 119,604
Mar 2020
253,551 253,551
Apr 2020
322,785 322,785
May 2020
344,839 344,839
Jun 2020
448,152 448,152
Jul 2020
448,038 448,038
Aug 2020
419,306 419,306
Sep 2020
339,725 339,725
Oct 2020
209,476 209,476
Nov 2020
144,465 144,465
Dec 2020
56,728 56,728
Jan 2021
47,602 47,602
Feb 2021
109,514 109,514
Mar 2021
340,751 340,751
Apr 2021
319,016 319,016
May 2021
416,789 416,789
Jun 2021
399,275 399,275
Jul 2021
313,535 313,535
Aug 2021
292,962 292,962
Sep 2021
303,464 303,464
Oct 2021
194,395 194,395
Nov 2021
156,878 156,878
Dec 2021
91,830 91,830
Jan 2022
40,016 40,016
Feb 2022
113,524 113,524
Mar 2022
234,819 234,819
Apr 2022
299,446 299,446
May 2022
392,330 392,330
Jun 2022
400,287 400,287
Jul 2022
130,700 130,700
Aug 2022
361,918 361,918
Sep 2022
250,191 250,191
Oct 2022
270,942 270,942
Nov 2022
169,523 169,523
Dec 2022
102,255 102,255
Jan 2023
44,199 44,199
Feb 2023
124,340 124,340
Mar 2023
228,904 228,904
Apr 2023
332,365 332,365
May 2023
421,110 421,110
Jun 2023
336,623 336,623
Jul 2023
320,134 320,134
Aug 2023
305,262 305,262
Sep 2023
279,569 279,569
Oct 2023
171,481 171,481
Nov 2023
117,242 117,242
Dec 2023
67,428 67,428
Jan 2024
61,524 61,524
Feb 2024
146,232 146,232
Mar 2024
245,677 245,677
Apr 2024
236,697 236,697
May 2024
357,249 357,249
Jun 2024
270,920 270,920
Jul 2024
314,441 314,441
Aug 2024
324,891 324,891
Sep 2024
307,227 307,227
Oct 2024
244,088 244,088
Nov 2024
146,196 146,196
Dec 2024
45,449 45,449

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The facility time series page shows electric generation from all DER projects in the facility. If available, utility import data is stacked on top to show total facility use. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for another date range or time step, select your desired months and time step and press “Go”. Due to performance constraints, hourly data may only be displayed within a date range of up to one month in length.

To download data used to create the time series plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Times are shown in Eastern Time (ET) and are adjusted to reflect Daylight Saving Time (DST).

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.