Skip to Main Content
Search distributed energy resources in New York

Letchworth CSD

Overview Letchworth CSD

The facility monthly summary plot page shows electric generation from all DER projects in the facility, and utility import data if available. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for different dates, select your desired date range and press “Go”.

To download data used to create the monthly summary plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The facility monthly summary table shows electric generation from all DER projects in the facility, and utility import and facility electric load data if available.

To view data for different dates, select your desired date range and press “Go”.

To download data from the monthly summary table in CSV format, press the download button to the top right of the table.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Summary Table

Jun 2017 to Jul 2024
Electric Generation (kWh) Electric Utility Import (kWh) Facility Electric Load (kWh)
Total 13,357,291 13,357,291
Jun 2017
109,378 109,378
Jul 2017
224,245 224,245
Aug 2017
237,046 237,046
Sep 2017
205,914 205,914
Oct 2017
164,454 164,454
Nov 2017
87,443 87,443
Dec 2017
43,097 43,097
Jan 2018
67,495 67,495
Feb 2018
95,083 95,083
Mar 2018
179,885 179,885
Apr 2018
167,262 167,262
May 2018
237,725 237,725
Jun 2018
224,985 224,985
Jul 2018
259,809 259,809
Aug 2018
204,221 204,221
Sep 2018
163,505 163,505
Oct 2018
111,239 111,239
Nov 2018
53,538 53,538
Dec 2018
45,390 45,390
Jan 2019
65,108 65,108
Feb 2019
87,829 87,829
Mar 2019
165,098 165,098
Apr 2019
171,893 171,893
May 2019
195,294 195,294
Jun 2019
226,636 226,636
Jul 2019
220,951 220,951
Aug 2019
231,359 231,359
Sep 2019
195,502 195,502
Oct 2019
151,167 151,167
Nov 2019
81,278 81,278
Dec 2019
55,912 55,912
Jan 2020
61,586 61,586
Feb 2020
77,534 77,534
Mar 2020
158,094 158,094
Apr 2020
171,144 171,144
May 2020
219,678 219,678
Jun 2020
265,114 265,114
Jul 2020
259,795 259,795
Aug 2020
236,540 236,540
Sep 2020
197,542 197,542
Oct 2020
125,228 125,228
Nov 2020
92,187 92,187
Dec 2020
57,588 57,588
Jan 2021
40,154 40,154
Feb 2021
96,156 96,156
Mar 2021
217,792 217,792
Apr 2021
189,964 189,964
May 2021
224,936 224,936
Jun 2021
238,170 238,170
Jul 2021
205,820 205,820
Aug 2021
217,388 217,388
Sep 2021
195,477 195,477
Oct 2021
126,165 126,165
Nov 2021
90,095 90,095
Dec 2021
57,790 57,790
Jan 2022
55,210 55,210
Feb 2022
88,204 88,204
Mar 2022
167,056 167,056
Apr 2022
181,372 181,372
May 2022
223,373 223,373
Jun 2022
250,425 250,425
Jul 2022
236,905 236,905
Aug 2022
215,661 215,661
Sep 2022
170,456 170,456
Oct 2022
167,347 167,347
Nov 2022
94,174 94,174
Dec 2022
55,172 55,172
Jan 2023
40,393 40,393
Feb 2023
108,671 108,671
Mar 2023
144,409 144,409
Apr 2023
205,968 205,968
May 2023
265,296 265,296
Jun 2023
205,329 205,329
Jul 2023
215,616 215,616
Aug 2023
199,640 199,640
Sep 2023
193,196 193,196
Oct 2023
116,531 116,531
Nov 2023
88,233 88,233
Dec 2023
49,522 49,522
Jan 2024
35,509 35,509
Feb 2024
128,542 128,542
Mar 2024
158,250 158,250
Apr 2024
162,065 162,065
May 2024
226,098 226,098
Jun 2024
207,362 207,362
Jul 2024
149,628 149,628

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The facility time series page shows electric generation from all DER projects in the facility. If available, utility import data is stacked on top to show total facility use. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for another date range or time step, select your desired months and time step and press “Go”. Due to performance constraints, hourly data may only be displayed within a date range of up to one month in length.

To download data used to create the time series plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Times are shown in Eastern Time (ET) and are adjusted to reflect Daylight Saving Time (DST).

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.