Skip to Main Content
Search distributed energy resources in New York

Canandaigua #1

Overview Canandaigua #1

The facility monthly summary plot page shows electric generation from all DER projects in the facility, and utility import data if available. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for different dates, select your desired date range and press “Go”.

To download data used to create the monthly summary plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

NYSERDA requires projects to submit performance data for up to three years. This project has exceeded its required monitoring period, and NYSERDA is no longer gathering project performance data. Solar projects have an expected lifespan of at least 25 years, and energy storage projects have an expected lifespan of at least 10 to 15 years. For more information about the current status of this project, please contact the project owner.

The facility monthly summary table shows electric generation from all DER projects in the facility, and utility import and facility electric load data if available.

To view data for different dates, select your desired date range and press “Go”.

To download data from the monthly summary table in CSV format, press the download button to the top right of the table.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Summary Table

Dec 2016 to Dec 2025
Electric Generation (kWh) Electric Utility Import (kWh) Facility Electric Load (kWh)
Total 22,955,565 — 22,955,565
Dec 2016
12,650 — 12,650
Jan 2017
82,488 — 82,488
Feb 2017
164,384 — 164,384
Mar 2017
196,105 — 196,105
Apr 2017
285,725 — 285,725
May 2017
275,903 — 275,903
Jun 2017
347,263 — 347,263
Jul 2017
337,946 — 337,946
Aug 2017
337,914 — 337,914
Sep 2017
300,681 — 300,681
Oct 2017
231,199 — 231,199
Nov 2017
129,205 — 129,205
Dec 2017
65,936 — 65,936
Jan 2018
88,380 — 88,380
Feb 2018
130,469 — 130,469
Mar 2018
262,091 — 262,091
Apr 2018
213,459 — 213,459
May 2018
348,673 — 348,673
Jun 2018
331,714 — 331,714
Jul 2018
382,837 — 382,837
Aug 2018
297,258 — 297,258
Sep 2018
263,506 — 263,506
Oct 2018
159,242 — 159,242
Nov 2018
78,474 — 78,474
Dec 2018
70,676 — 70,676
Jan 2019
61,323 — 61,323
Feb 2019
108,424 — 108,424
Mar 2019
232,770 — 232,770
Apr 2019
239,406 — 239,406
May 2019
260,724 — 260,724
Jun 2019
322,467 — 322,467
Jul 2019
326,314 — 326,314
Aug 2019
324,663 — 324,663
Sep 2019
286,640 — 286,640
Oct 2019
210,909 — 210,909
Nov 2019
114,018 — 114,018
Dec 2019
79,702 — 79,702
Jan 2020
62,416 — 62,416
Feb 2020
125,726 — 125,726
Mar 2020
235,885 — 235,885
Apr 2020
243,402 — 243,402
May 2020
329,573 — 329,573
Jun 2020
383,246 — 383,246
Jul 2020
375,376 — 375,376
Aug 2020
346,617 — 346,617
Sep 2020
243,129 — 243,129
Oct 2020
189,335 — 189,335
Nov 2020
130,620 — 130,620
Dec 2020
61,765 — 61,765
Jan 2021
53,228 — 53,228
Feb 2021
124,209 — 124,209
Mar 2021
290,756 — 290,756
Apr 2021
261,382 — 261,382
May 2021
328,972 — 328,972
Jun 2021
328,707 — 328,707
Jul 2021
295,979 — 295,979
Aug 2021
319,685 — 319,685
Sep 2021
270,221 — 270,221
Oct 2021
180,425 — 180,425
Nov 2021
147,326 — 147,326
Dec 2021
94,795 — 94,795
Jan 2022
75,666 — 75,666
Feb 2022
104,869 — 104,869
Mar 2022
212,897 — 212,897
Apr 2022
259,602 — 259,602
May 2022
210,724 — 210,724
Jun 2022
306,172 — 306,172
Jul 2022
333,876 — 333,876
Aug 2022
298,480 — 298,480
Sep 2022
232,845 — 232,845
Oct 2022
160,798 — 160,798
Nov 2022
155,155 — 155,155
Dec 2022
84,560 — 84,560
Jan 2023
58,397 — 58,397
Feb 2023
141,078 — 141,078
Mar 2023
171,899 — 171,899
Apr 2023
251,884 — 251,884
May 2023
368,254 — 368,254
Jun 2023
284,860 — 284,860
Jul 2023
299,583 — 299,583
Aug 2023
273,539 — 273,539
Sep 2023
261,034 — 261,034
Oct 2023
157,444 — 157,444
Nov 2023
115,443 — 115,443
Dec 2023
70,459 — 70,459
Jan 2024
37,887 — 37,887
Feb 2024
169,745 — 169,745
Mar 2024
218,353 — 218,353
Apr 2024
214,267 — 214,267
May 2024
290,585 — 290,585
Jun 2024
274,445 — 274,445
Jul 2024
259,881 — 259,881
Aug 2024
258,466 — 258,466
Sep 2024
239,877 — 239,877
Oct 2024
235,204 — 235,204
Nov 2024
131,948 — 131,948
Dec 2024
62,178 — 62,178
Jan 2025
64,466 — 64,466
Feb 2025
87,928 — 87,928
Mar 2025
210,945 — 210,945
Apr 2025
237,089 — 237,089
May 2025
225,203 — 225,203
Jun 2025
265,247 — 265,247
Jul 2025
274,037 — 274,037
Aug 2025
270,094 — 270,094
Sep 2025
272,807 — 272,807
Oct 2025
231,863 — 231,863
Nov 2025
101,303 — 101,303
Dec 2025
47,913 — 47,913

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

NYSERDA requires projects to submit performance data for up to three years. This project has exceeded its required monitoring period, and NYSERDA is no longer gathering project performance data. Solar projects have an expected lifespan of at least 25 years, and energy storage projects have an expected lifespan of at least 10 to 15 years. For more information about the current status of this project, please contact the project owner.

The facility time series page shows electric generation from all DER projects in the facility. If available, utility import data is stacked on top to show total facility use. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for another date range or time step, select your desired months and time step and press “Go”. Due to performance constraints, hourly data may only be displayed within a date range of up to one month in length.

To download data used to create the time series plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Times are shown in Eastern Time (ET) and are adjusted to reflect Daylight Saving Time (DST).

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

NYSERDA requires projects to submit performance data for up to three years. This project has exceeded its required monitoring period, and NYSERDA is no longer gathering project performance data. Solar projects have an expected lifespan of at least 25 years, and energy storage projects have an expected lifespan of at least 10 to 15 years. For more information about the current status of this project, please contact the project owner.