Skip to Main Content
Search distributed energy resources in New York

Affordable Housing - 42160 Airport Rd

Overview Affordable Housing - 42160 Airport Rd Wawayanda, Tax Lot - PV Systems

The facility monthly summary plot page shows electric generation from all DER projects in the facility, and utility import data if available. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for different dates, select your desired date range and press “Go”.

To download data used to create the monthly summary plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The facility monthly summary table shows electric generation from all DER projects in the facility, and utility import and facility electric load data if available.

To view data for different dates, select your desired date range and press “Go”.

To download data from the monthly summary table in CSV format, press the download button to the top right of the table.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Summary Table

Dec 2023 to Apr 2026
Electric Generation (MWh) Electric Utility Import (MWh) Facility Electric Load (MWh)
Total 19,577 19,577
Dec 2023
287 287
Jan 2024
293 293
Feb 2024
689 689
Mar 2024
724 724
Apr 2024
739 739
May 2024
860 860
Jun 2024
937 937
Jul 2024
1,005 1,005
Aug 2024
843 843
Sep 2024
784 784
Oct 2024
840 840
Nov 2024
620 620
Dec 2024
448 448
Jan 2025
401 401
Feb 2025
562 562
Mar 2025
728 728
Apr 2025
738 738
May 2025
719 719
Jun 2025
803 803
Jul 2025
988 988
Aug 2025
970 970
Sep 2025
873 873
Oct 2025
743 743
Nov 2025
462 462
Dec 2025
380 380
Jan 2026
390 390
Feb 2026
364 364
Mar 2026
597 597
Apr 2026
788 788

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The facility time series page shows electric generation from all DER projects in the facility. If available, utility import data is stacked on top to show total facility use. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for another date range or time step, select your desired months and time step and press “Go”. Due to performance constraints, hourly data may only be displayed within a date range of up to one month in length.

To download data used to create the time series plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Times are shown in Eastern Time (ET) and are adjusted to reflect Daylight Saving Time (DST).

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.