Skip to Main Content
Search distributed energy resources in New York

Delaware River Solar - Turner Road

Overview Delaware River Solar - 50832

The facility monthly summary plot page shows electric generation from all DER projects in the facility, and utility import data if available. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for different dates, select your desired date range and press “Go”.

To download data used to create the monthly summary plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The facility monthly summary table shows electric generation from all DER projects in the facility, and utility import and facility electric load data if available.

To view data for different dates, select your desired date range and press “Go”.

To download data from the monthly summary table in CSV format, press the download button to the top right of the table.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Summary Table

Jan 2019 to Jul 2024
Electric Generation (kWh) Electric Utility Import (kWh) Facility Electric Load (kWh)
Total 16,686,028 16,686,028
Jan 2019
52,730 52,730
Feb 2019
175,830 175,830
Mar 2019
245,725 245,725
Apr 2019
267,804 267,804
May 2019
309,245 309,245
Jun 2019
369,575 369,575
Jul 2019
386,449 386,449
Aug 2019
369,129 369,129
Sep 2019
310,556 310,556
Oct 2019
217,476 217,476
Nov 2019
146,249 146,249
Dec 2019
90,268 90,268
Jan 2020
109,280 109,280
Feb 2020
163,125 163,125
Mar 2020
266,236 266,236
Apr 2020
270,131 270,131
May 2020
369,924 369,924
Jun 2020
413,998 413,998
Jul 2020
404,387 404,387
Aug 2020
383,252 383,252
Sep 2020
327,927 327,927
Oct 2020
228,178 228,178
Nov 2020
175,606 175,606
Dec 2020
82,976 82,976
Jan 2021
97,680 97,680
Feb 2021
162,054 162,054
Mar 2021
346,505 346,505
Apr 2021
314,672 314,672
May 2021
371,113 371,113
Jun 2021
384,025 384,025
Jul 2021
347,241 347,241
Aug 2021
334,058 334,058
Sep 2021
285,167 285,167
Oct 2021
201,214 201,214
Nov 2021
165,653 165,653
Dec 2021
109,578 109,578
Jan 2022
163,405 163,405
Feb 2022
195,203 195,203
Mar 2022
264,245 264,245
Apr 2022
296,501 296,501
May 2022
360,997 360,997
Jun 2022
393,817 393,817
Jul 2022
390,758 390,758
Aug 2022
351,222 351,222
Sep 2022
232,098 232,098
Oct 2022
245,052 245,052
Nov 2022
176,076 176,076
Dec 2022
87,467 87,467
Jan 2023
80,035 80,035
Feb 2023
178,702 178,702
Mar 2023
209,190 209,190
Apr 2023
271,204 271,204
May 2023
359,811 359,811
Jun 2023
294,818 294,818
Jul 2023
291,593 291,593
Aug 2023
299,632 299,632
Sep 2023
277,202 277,202
Oct 2023
195,561 195,561
Nov 2023
162,558 162,558
Dec 2023
100,248 100,248
Jan 2024
75,437 75,437
Feb 2024
224,627 224,627
Mar 2024
230,679 230,679
Apr 2024
237,333 237,333
May 2024
319,013 319,013
Jun 2024
323,832 323,832
Jul 2024
142,695 142,695

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The facility time series page shows electric generation from all DER projects in the facility. If available, utility import data is stacked on top to show total facility use. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for another date range or time step, select your desired months and time step and press “Go”. Due to performance constraints, hourly data may only be displayed within a date range of up to one month in length.

To download data used to create the time series plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Times are shown in Eastern Time (ET) and are adjusted to reflect Daylight Saving Time (DST).

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.