The facility monthly summary plot page shows electric generation from all DER projects in the facility, and utility import data if available. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for different dates, select your desired date range and press “Go”.

To download data used to create the monthly summary plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

NYSERDA requires projects to submit performance data for up to three years. This project has exceeded its required monitoring period, and NYSERDA is no longer gathering project performance data. Solar projects have an expected lifespan of at least 25 years, and energy storage projects have an expected lifespan of at least 10 to 15 years. For more information about the current status of this project, please contact the project owner.

The facility monthly summary table shows electric generation from all DER projects in the facility, and utility import and facility electric load data if available.

To view data for different dates, select your desired date range and press “Go”.

To download data from the monthly summary table in CSV format, press the download button to the top right of the table.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Summary Table

May 2010 to Apr 2014
Electric Generation (kWh) Electric Utility Import (kWh) Facility Electric Load (kWh)
Total 12,938,976 — 12,938,976
May 2010
0 — 0
Jun 2010
213,937 — 213,937
Jul 2010
351,287 — 351,287
Aug 2010
370,921 — 370,921
Sep 2010
367,113 — 367,113
Oct 2010
395,780 — 395,780
Nov 2010
375,918 — 375,918
Dec 2010
398,111 — 398,111
Jan 2011
402,197 — 402,197
Feb 2011
335,356 — 335,356
Mar 2011
376,197 — 376,197
Apr 2011
361,306 — 361,306
May 2011
333,967 — 333,967
Jun 2011
339,229 — 339,229
Jul 2011
358,422 — 358,422
Aug 2011
377,271 — 377,271
Sep 2011
366,612 — 366,612
Oct 2011
388,416 — 388,416
Nov 2011
382,060 — 382,060
Dec 2011
400,143 — 400,143
Jan 2012
388,791 — 388,791
Feb 2012
335,442 — 335,442
Mar 2012
381,596 — 381,596
Apr 2012
363,869 — 363,869
May 2012
329,973 — 329,973
Jun 2012
312,810 — 312,810
Jul 2012
308,703 — 308,703
Aug 2012
334,466 — 334,466
Sep 2012
358,180 — 358,180
Oct 2012
351,424 — 351,424
Nov 2012
0 — 0
Dec 2012
0 — 0
Jan 2013
0 — 0
Feb 2013
115,067 — 115,067
Mar 2013
266,860 — 266,860
Apr 2013
270,371 — 270,371
May 2013
289,068 — 289,068
Jun 2013
292,977 — 292,977
Jul 2013
216,711 — 216,711
Aug 2013
0 — 0
Sep 2013
0 — 0
Oct 2013
0 — 0
Nov 2013
209,737 — 209,737
Dec 2013
349,249 — 349,249
Jan 2014
254,789 — 254,789
Feb 2014
214,160 — 214,160
Mar 2014
100,490 — 100,490
Apr 2014
0 — 0

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

NYSERDA requires projects to submit performance data for up to three years. This project has exceeded its required monitoring period, and NYSERDA is no longer gathering project performance data. Solar projects have an expected lifespan of at least 25 years, and energy storage projects have an expected lifespan of at least 10 to 15 years. For more information about the current status of this project, please contact the project owner.

The facility time series page shows electric generation from all DER projects in the facility. If available, utility import data is stacked on top to show total facility use. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for another date range or time step, select your desired months and time step and press “Go”. Due to performance constraints, hourly data may only be displayed within a date range of up to one month in length.

To download data used to create the time series plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Times are shown in Eastern Time (ET) and are adjusted to reflect Daylight Saving Time (DST).

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

NYSERDA requires projects to submit performance data for up to three years. This project has exceeded its required monitoring period, and NYSERDA is no longer gathering project performance data. Solar projects have an expected lifespan of at least 25 years, and energy storage projects have an expected lifespan of at least 10 to 15 years. For more information about the current status of this project, please contact the project owner.