Brooklyn Navy Yard - Building 293

Overview Brooklyn Navy Yard - Building 293

The facility monthly summary plot page shows electric generation from all DER projects in the facility, and utility import data if available. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for different dates, select your desired date range and press “Go”.

To download data used to create the monthly summary plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

NYSERDA requires projects to submit performance data for up to three years. This project has exceeded its required monitoring period, and NYSERDA is no longer gathering project performance data. Solar projects have an expected lifespan of at least 25 years, and energy storage projects have an expected lifespan of at least 10 to 15 years. For more information about the current status of this project, please contact the project owner.

The facility monthly summary table shows electric generation from all DER projects in the facility, and utility import and facility electric load data if available.

To view data for different dates, select your desired date range and press “Go”.

To download data from the monthly summary table in CSV format, press the download button to the top right of the table.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Summary Table

May 2016 to Apr 2026
Electric Generation (kWh) Electric Utility Import (kWh) Facility Electric Load (kWh)
Total 8,790,388 — 8,790,388
May 2016
6,536 — 6,536
Jun 2016
42,990 — 42,990
Jul 2016
71,614 — 71,614
Aug 2016
122,174 — 122,174
Sep 2016
83,313 — 83,313
Oct 2016
64,957 — 64,957
Nov 2016
45,748 — 45,748
Dec 2016
31,532 — 31,532
Jan 2017
25,080 — 25,080
Feb 2017
51,919 — 51,919
Mar 2017
59,900 — 59,900
Apr 2017
93,941 — 93,941
May 2017
98,927 — 98,927
Jun 2017
127,462 — 127,462
Jul 2017
124,415 — 124,415
Aug 2017
112,339 — 112,339
Sep 2017
92,093 — 92,093
Oct 2017
65,724 — 65,724
Nov 2017
45,800 — 45,800
Dec 2017
27,165 — 27,165
Jan 2018
37,758 — 37,758
Feb 2018
40,942 — 40,942
Mar 2018
73,321 — 73,321
Apr 2018
94,735 — 94,735
May 2018
101,550 — 101,550
Jun 2018
120,355 — 120,355
Jul 2018
124,699 — 124,699
Aug 2018
99,310 — 99,310
Sep 2018
55,784 — 55,784
Oct 2018
55,767 — 55,767
Nov 2018
37,228 — 37,228
Dec 2018
32,383 — 32,383
Jan 2019
38,621 — 38,621
Feb 2019
52,183 — 52,183
Mar 2019
75,551 — 75,551
Apr 2019
98,563 — 98,563
May 2019
110,869 — 110,869
Jun 2019
122,263 — 122,263
Jul 2019
128,043 — 128,043
Aug 2019
113,106 — 113,106
Sep 2019
90,690 — 90,690
Oct 2019
55,065 — 55,065
Nov 2019
46,929 — 46,929
Dec 2019
25,998 — 25,998
Jan 2020
39,422 — 39,422
Feb 2020
50,964 — 50,964
Mar 2020
78,775 — 78,775
Apr 2020
85,010 — 85,010
May 2020
135,244 — 135,244
Jun 2020
131,557 — 131,557
Jul 2020
123,707 — 123,707
Aug 2020
100,016 — 100,016
Sep 2020
88,560 — 88,560
Oct 2020
54,768 — 54,768
Nov 2020
41,373 — 41,373
Dec 2020
25,507 — 25,507
Jan 2021
41,539 — 41,539
Feb 2021
10,286 — 10,286
Mar 2021
79,862 — 79,862
Apr 2021
99,439 — 99,439
May 2021
119,377 — 119,377
Jun 2021
118,432 — 118,432
Jul 2021
107,917 — 107,917
Aug 2021
93,170 — 93,170
Sep 2021
85,460 — 85,460
Oct 2021
55,604 — 55,604
Nov 2021
45,324 — 45,324
Dec 2021
31,815 — 31,815
Jan 2022
32,010 — 32,010
Feb 2022
47,766 — 47,766
Mar 2022
81,743 — 81,743
Apr 2022
105,012 — 105,012
May 2022
111,602 — 111,602
Jun 2022
123,552 — 123,552
Jul 2022
124,553 — 124,553
Aug 2022
107,872 — 107,872
Sep 2022
89,030 — 89,030
Oct 2022
60,244 — 60,244
Nov 2022
44,979 — 44,979
Dec 2022
33,201 — 33,201
Jan 2023
29,670 — 29,670
Feb 2023
49,090 — 49,090
Mar 2023
78,240 — 78,240
Apr 2023
91,745 — 91,745
May 2023
131,592 — 131,592
Jun 2023
76,770 — 76,770
Jul 2023
112,994 — 112,994
Aug 2023
96,552 — 96,552
Sep 2023
71,314 — 71,314
Oct 2023
60,455 — 60,455
Nov 2023
37,506 — 37,506
Dec 2023
28,025 — 28,025
Jan 2024
19,612 — 19,612
Feb 2024
44,595 — 44,595
Mar 2024
77,197 — 77,197
Apr 2024
91,529 — 91,529
May 2024
103,582 — 103,582
Jun 2024
116,839 — 116,839
Jul 2024
114,280 — 114,280
Aug 2024
95,068 — 95,068
Sep 2024
75,513 — 75,513
Oct 2024
67,218 — 67,218
Nov 2024
39,883 — 39,883
Dec 2024
27,194 — 27,194
Jan 2025
32,106 — 32,106
Feb 2025
44,902 — 44,902
Mar 2025
78,892 — 78,892
Apr 2025
86,717 — 86,717
May 2025
91,825 — 91,825
Jun 2025
97,292 — 97,292
Jul 2025
109,546 — 109,546
Aug 2025
104,466 — 104,466
Sep 2025
80,666 — 80,666
Oct 2025
57,977 — 57,977
Nov 2025
37,150 — 37,150
Dec 2025
25,740 — 25,740
Jan 2026
21,350 — 21,350
Feb 2026
480 — 480
Mar 2026
63,710 — 63,710
Apr 2026
91,070 — 91,070

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

NYSERDA requires projects to submit performance data for up to three years. This project has exceeded its required monitoring period, and NYSERDA is no longer gathering project performance data. Solar projects have an expected lifespan of at least 25 years, and energy storage projects have an expected lifespan of at least 10 to 15 years. For more information about the current status of this project, please contact the project owner.

The facility time series page shows electric generation from all DER projects in the facility. If available, utility import data is stacked on top to show total facility use. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for another date range or time step, select your desired months and time step and press “Go”. Due to performance constraints, hourly data may only be displayed within a date range of up to one month in length.

To download data used to create the time series plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Times are shown in Eastern Time (ET) and are adjusted to reflect Daylight Saving Time (DST).

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

NYSERDA requires projects to submit performance data for up to three years. This project has exceeded its required monitoring period, and NYSERDA is no longer gathering project performance data. Solar projects have an expected lifespan of at least 25 years, and energy storage projects have an expected lifespan of at least 10 to 15 years. For more information about the current status of this project, please contact the project owner.