Skip to Main Content
Search distributed energy resources in New York

DG New York CS, LLC - 6580 Dunnsville Road

Overview DG New York CS, LLC - 6580 Dunnsville Road - PV Systems

The facility monthly summary plot page shows electric generation from all DER projects in the facility, and utility import data if available. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for different dates, select your desired date range and press “Go”.

To download data used to create the monthly summary plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The facility monthly summary table shows electric generation from all DER projects in the facility, and utility import and facility electric load data if available.

To view data for different dates, select your desired date range and press “Go”.

To download data from the monthly summary table in CSV format, press the download button to the top right of the table.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Summary Table

Jan 2025 to Apr 2026
Electric Generation (kWh) Electric Utility Import (kWh) Facility Electric Load (kWh)
Total 4,728,691 4,728,691
Jan 2025
208,949 208,949
Feb 2025
31,217 31,217
Mar 2025
580,212 580,212
Apr 2025
736,609 736,609
May 2025
589,532 589,532
Jun 2025
365,893 365,893
Jul 2025
134,414 134,414
Aug 2025
240,774 240,774
Sep 2025
241,232 241,232
Oct 2025
257,272 257,272
Nov 2025
153,698 153,698
Dec 2025
119,012 119,012
Jan 2026
143,402 143,402
Feb 2026
123,708 123,708
Mar 2026
316,605 316,605
Apr 2026
486,163 486,163

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The facility time series page shows electric generation from all DER projects in the facility. If available, utility import data is stacked on top to show total facility use. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for another date range or time step, select your desired months and time step and press “Go”. Due to performance constraints, hourly data may only be displayed within a date range of up to one month in length.

To download data used to create the time series plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Times are shown in Eastern Time (ET) and are adjusted to reflect Daylight Saving Time (DST).

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.