Skip to Main Content
Search distributed energy resources in New York

ASA Clayton NY Solar I LLC

Overview ASA Clayton NY Solar I LLC

The facility monthly summary plot page shows electric generation from all DER projects in the facility, and utility import data if available. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for different dates, select your desired date range and press “Go”.

To download data used to create the monthly summary plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The facility monthly summary table shows electric generation from all DER projects in the facility, and utility import and facility electric load data if available.

To view data for different dates, select your desired date range and press “Go”.

To download data from the monthly summary table in CSV format, press the download button to the top right of the table.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Summary Table

Aug 2024 to Jun 2026
Electric Generation (kWh) Electric Utility Import (kWh) Facility Electric Load (kWh)
Total 4,087,442 4,087,442
Aug 2024
15,765 15,765
Sep 2024
194,652 194,652
Oct 2024
191,214 191,214
Nov 2024
110,319 110,319
Dec 2024
73,822 73,822
Jan 2025
99,755 99,755
Feb 2025
144,438 144,438
Mar 2025
214,059 214,059
Apr 2025
245,150 245,150
May 2025
245,083 245,083
Jun 2025
273,202 273,202
Jul 2025
368,651 368,651
Aug 2025
331,891 331,891
Sep 2025
284,895 284,895
Oct 2025
202,163 202,163
Nov 2025
85,577 85,577
Dec 2025
54,724 54,724
Jan 2026
49,838 49,838
Feb 2026
73,829 73,829
Mar 2026
170,506 170,506
Apr 2026
219,429 219,429
May 2026
275,942 275,942
Jun 2026
162,538 162,538

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The facility time series page shows electric generation from all DER projects in the facility. If available, utility import data is stacked on top to show total facility use. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for another date range or time step, select your desired months and time step and press “Go”. Due to performance constraints, hourly data may only be displayed within a date range of up to one month in length.

To download data used to create the time series plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Times are shown in Eastern Time (ET) and are adjusted to reflect Daylight Saving Time (DST).

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.