Search distributed energy resources in New York

Delaware River Solar, LLC - 3167 State Route 17C

Overview Delaware River Solar, LLC - 3167 State Route 17C - PV Systems

The facility monthly summary plot page shows electric generation from all DER projects in the facility, and utility import data if available. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for different dates, select your desired date range and press “Go”.

To download data used to create the monthly summary plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The facility monthly summary table shows electric generation from all DER projects in the facility, and utility import and facility electric load data if available.

To view data for different dates, select your desired date range and press “Go”.

To download data from the monthly summary table in CSV format, press the download button to the top right of the table.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Summary Table

Jul 2024 to May 2026
Electric Generation (MWh) Electric Utility Import (MWh) Facility Electric Load (MWh)
Total 13,142 13,142
Jul 2024
846 846
Aug 2024
686 686
Sep 2024
741 741
Oct 2024
714 714
Nov 2024
320 320
Dec 2024
235 235
Jan 2025
359 359
Feb 2025
453 453
Mar 2025
709 709
Apr 2025
534 534
May 2025
486 486
Jun 2025
710 710
Jul 2025
1,003 1,003
Aug 2025
866 866
Sep 2025
839 839
Oct 2025
662 662
Nov 2025
291 291
Dec 2025
268 268
Jan 2026
327 327
Feb 2026
271 271
Mar 2026
487 487
Apr 2026
821 821
May 2026
514 514

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The facility time series page shows electric generation from all DER projects in the facility. If available, utility import data is stacked on top to show total facility use. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for another date range or time step, select your desired months and time step and press “Go”. Due to performance constraints, hourly data may only be displayed within a date range of up to one month in length.

To download data used to create the time series plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Times are shown in Eastern Time (ET) and are adjusted to reflect Daylight Saving Time (DST).

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.