Skip to Main Content
Search distributed energy resources in New York

Lower Road III LLC - 310 County Road 12

Overview Lower Road III LLC - 310 County Road 12 - PV Systems

The facility monthly summary plot page shows electric generation from all DER projects in the facility, and utility import data if available. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for different dates, select your desired date range and press “Go”.

To download data used to create the monthly summary plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The facility monthly summary table shows electric generation from all DER projects in the facility, and utility import and facility electric load data if available.

To view data for different dates, select your desired date range and press “Go”.

To download data from the monthly summary table in CSV format, press the download button to the top right of the table.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Summary Table

Jun 2024 to Jun 2026
Electric Generation (kWh) Electric Utility Import (kWh) Facility Electric Load (kWh)
Total 7,741,746 7,741,746
Jun 2024
227,680 227,680
Jul 2024
335,117 335,117
Aug 2024
448,807 448,807
Sep 2024
437,864 437,864
Oct 2024
468,274 468,274
Nov 2024
278,486 278,486
Dec 2024
198,808 198,808
Jan 2025
154,840 154,840
Feb 2025
262,646 262,646
Mar 2025
371,610 371,610
Apr 2025
441,169 441,169
May 2025
426,434 426,434
Jun 2025
455,782 455,782
Jul 2025
605,539 605,539
Aug 2025
569,014 569,014
Sep 2025
434,347 434,347
Oct 2025
334,276 334,276
Nov 2025
192,313 192,313
Dec 2025
170,838 170,838
Jan 2026
198,943 198,943
Feb 2026
143,640 143,640
Mar 2026
273,021 273,021
Apr 2026
312,298 312,298
May 2026
0 0
Jun 2026
0 0

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The facility time series page shows electric generation from all DER projects in the facility. If available, utility import data is stacked on top to show total facility use. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for another date range or time step, select your desired months and time step and press “Go”. Due to performance constraints, hourly data may only be displayed within a date range of up to one month in length.

To download data used to create the time series plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Times are shown in Eastern Time (ET) and are adjusted to reflect Daylight Saving Time (DST).

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.