Skip to Main Content
Search distributed energy resources in New York

Lewis Custom Homes Inc. - 4534 Route 233

Overview Lewis Custom Homes Inc. - 4534 Route 233 - PV Systems

The facility monthly summary plot page shows electric generation from all DER projects in the facility, and utility import data if available. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for different dates, select your desired date range and press “Go”.

To download data used to create the monthly summary plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The facility monthly summary table shows electric generation from all DER projects in the facility, and utility import and facility electric load data if available.

To view data for different dates, select your desired date range and press “Go”.

To download data from the monthly summary table in CSV format, press the download button to the top right of the table.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Summary Table

May 2024 to May 2026
Electric Generation (kWh) Electric Utility Import (kWh) Facility Electric Load (kWh)
Total 3,503,117 3,503,117
May 2024
98,360 98,360
Jun 2024
653,604 653,604
Jul 2024
736,210 736,210
Aug 2024
577,494 577,494
Sep 2024
102,115 102,115
Oct 2024
0 0
Nov 2024
0 0
Dec 2024
0 0
Jan 2025
18,797 18,797
Feb 2025
0 0
Mar 2025
0 0
Apr 2025
0 0
May 2025
0 0
Jun 2025
0 0
Jul 2025
0 0
Aug 2025
0 0
Sep 2025
0 0
Oct 2025
192,278 192,278
Nov 2025
179,914 179,914
Dec 2025
67,664 67,664
Jan 2026
76,169 76,169
Feb 2026
78,462 78,462
Mar 2026
153,027 153,027
Apr 2026
370,691 370,691
May 2026
198,331 198,331

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The facility time series page shows electric generation from all DER projects in the facility. If available, utility import data is stacked on top to show total facility use. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for another date range or time step, select your desired months and time step and press “Go”. Due to performance constraints, hourly data may only be displayed within a date range of up to one month in length.

To download data used to create the time series plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Times are shown in Eastern Time (ET) and are adjusted to reflect Daylight Saving Time (DST).

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.