Claverack Solar 1, LLC - 239 Stottville Road

Overview Claverack Solar 1, LLC - 239 Stottville Road - PV Systems

The facility monthly summary plot page shows electric generation from all DER projects in the facility, and utility import data if available. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for different dates, select your desired date range and press “Go”.

To download data used to create the monthly summary plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The facility monthly summary table shows electric generation from all DER projects in the facility, and utility import and facility electric load data if available.

To view data for different dates, select your desired date range and press “Go”.

To download data from the monthly summary table in CSV format, press the download button to the top right of the table.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Summary Table

Apr 2024 to May 2026
Electric Generation (MWh) Electric Utility Import (MWh) Facility Electric Load (MWh)
Total 18,533 18,533
Apr 2024
335 335
May 2024
1,052 1,052
Jun 2024
989 989
Jul 2024
1,109 1,109
Aug 2024
907 907
Sep 2024
902 902
Oct 2024
843 843
Nov 2024
519 519
Dec 2024
337 337
Jan 2025
365 365
Feb 2025
503 503
Mar 2025
772 772
Apr 2025
814 814
May 2025
820 820
Jun 2025
984 984
Jul 2025
1,116 1,116
Aug 2025
1,112 1,112
Sep 2025
913 913
Oct 2025
681 681
Nov 2025
376 376
Dec 2025
330 330
Jan 2026
287 287
Feb 2026
204 204
Mar 2026
578 578
Apr 2026
871 871
May 2026
815 815

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The facility time series page shows electric generation from all DER projects in the facility. If available, utility import data is stacked on top to show total facility use. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for another date range or time step, select your desired months and time step and press “Go”. Due to performance constraints, hourly data may only be displayed within a date range of up to one month in length.

To download data used to create the time series plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Times are shown in Eastern Time (ET) and are adjusted to reflect Daylight Saving Time (DST).

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.