Skip to Main Content
Search distributed energy resources in New York

Delaware River Solar, LLC - 54 Old Catskill Tpke

Overview Delaware River Solar, LLC - 54 Old Catskill Tpke - PV Systems

The facility monthly summary plot page shows electric generation from all DER projects in the facility, and utility import data if available. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for different dates, select your desired date range and press “Go”.

To download data used to create the monthly summary plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The facility monthly summary table shows electric generation from all DER projects in the facility, and utility import and facility electric load data if available.

To view data for different dates, select your desired date range and press “Go”.

To download data from the monthly summary table in CSV format, press the download button to the top right of the table.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Summary Table

Oct 2023 to Apr 2026
Electric Generation (kWh) Electric Utility Import (kWh) Facility Electric Load (kWh)
Total 12,939,972 12,939,972
Oct 2023
401,732 401,732
Nov 2023
311,217 311,217
Dec 2023
186,272 186,272
Jan 2024
130,444 130,444
Feb 2024
454,118 454,118
Mar 2024
359,328 359,328
Apr 2024
534,969 534,969
May 2024
720,509 720,509
Jun 2024
746,988 746,988
Jul 2024
835,293 835,293
Aug 2024
621,181 621,181
Sep 2024
683,689 683,689
Oct 2024
626,906 626,906
Nov 2024
343,799 343,799
Dec 2024
137,628 137,628
Jan 2025
174,103 174,103
Feb 2025
320,563 320,563
Mar 2025
496,973 496,973
Apr 2025
600,085 600,085
May 2025
575,354 575,354
Jun 2025
676,241 676,241
Jul 2025
359,609 359,609
Aug 2025
24,139 24,139
Sep 2025
417,303 417,303
Oct 2025
516,005 516,005
Nov 2025
232,528 232,528
Dec 2025
100,596 100,596
Jan 2026
207,648 207,648
Feb 2026
124,065 124,065
Mar 2026
410,368 410,368
Apr 2026
610,320 610,320

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The facility time series page shows electric generation from all DER projects in the facility. If available, utility import data is stacked on top to show total facility use. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for another date range or time step, select your desired months and time step and press “Go”. Due to performance constraints, hourly data may only be displayed within a date range of up to one month in length.

To download data used to create the time series plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Times are shown in Eastern Time (ET) and are adjusted to reflect Daylight Saving Time (DST).

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.