Tudor Gardens
- Monthly Plot
- Monthly Table
- Time Series
The facility monthly summary plot page shows electric generation from all DER projects in the facility, and utility import data if available. The sum of the DER generation and utility import data represents the total facility electric load.
To view data for different dates, select your desired date range and press “Go”.
To download data used to create the monthly summary plot in CSV format, press the download button to the top right of the chart.
Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.
Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.
The facility monthly summary table shows electric generation from all DER projects in the facility, and utility import and facility electric load data if available.
To view data for different dates, select your desired date range and press “Go”.
To download data from the monthly summary table in CSV format, press the download button to the top right of the table.
Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.
Summary Table
Electric Generation (kWh) | Electric Utility Import (kWh) | Facility Electric Load (kWh) | |
---|---|---|---|
Total | 1,458,717 | — | 1,458,717 |
Jul 2005 |
92,592 | — | 92,592 |
Aug 2005 |
95,192 | — | 95,192 |
Sep 2005 |
88,001 | — | 88,001 |
Oct 2005 |
95,386 | — | 95,386 |
Nov 2005 |
87,728 | — | 87,728 |
Dec 2005 |
93,826 | — | 93,826 |
Jan 2006 |
87,887 | — | 87,887 |
Feb 2006 |
85,262 | — | 85,262 |
Mar 2006 |
95,168 | — | 95,168 |
Apr 2006 |
70,753 | — | 70,753 |
May 2006 |
94,534 | — | 94,534 |
Jun 2006 |
79,859 | — | 79,859 |
Jul 2006 |
87,498 | — | 87,498 |
Aug 2006 |
89,954 | — | 89,954 |
Sep 2006 |
85,788 | — | 85,788 |
Oct 2006 |
88,057 | — | 88,057 |
Nov 2006 |
41,232 | — | 41,232 |
Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.
The facility time series page shows electric generation from all DER projects in the facility. If available, utility import data is stacked on top to show total facility use. The sum of the DER generation and utility import data represents the total facility electric load.
To view data for another date range or time step, select your desired months and time step and press “Go”. Due to performance constraints, hourly data may only be displayed within a date range of up to one month in length.
To download data used to create the time series plot in CSV format, press the download button to the top right of the chart.
Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.
Times are shown in Eastern Time (ET) and are adjusted to reflect Daylight Saving Time (DST).
Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.