ELP Claverack Solar LLC - 383 NY-9H

Overview ELP Claverack Solar LLC - 109 Fish and Game Road - PV Systems

The facility monthly summary plot page shows electric generation from all DER projects in the facility, and utility import data if available. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for different dates, select your desired date range and press “Go”.

To download data used to create the monthly summary plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The facility monthly summary table shows electric generation from all DER projects in the facility, and utility import and facility electric load data if available.

To view data for different dates, select your desired date range and press “Go”.

To download data from the monthly summary table in CSV format, press the download button to the top right of the table.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Summary Table

Apr 2023 to Apr 2026
Electric Generation (MWh) Electric Utility Import (MWh) Facility Electric Load (MWh)
Total 26,141 26,141
Apr 2023
395 395
May 2023
1,231 1,231
Jun 2023
953 953
Jul 2023
1,004 1,004
Aug 2023
924 924
Sep 2023
824 824
Oct 2023
676 676
Nov 2023
546 546
Dec 2023
341 341
Jan 2024
308 308
Feb 2024
548 548
Mar 2024
719 719
Apr 2024
761 761
May 2024
837 837
Jun 2024
1,046 1,046
Jul 2024
1,112 1,112
Aug 2024
760 760
Sep 2024
459 459
Oct 2024
495 495
Nov 2024
590 590
Dec 2024
397 397
Jan 2025
434 434
Feb 2025
568 568
Mar 2025
811 811
Apr 2025
800 800
May 2025
838 838
Jun 2025
1,000 1,000
Jul 2025
1,119 1,119
Aug 2025
1,109 1,109
Sep 2025
955 955
Oct 2025
797 797
Nov 2025
428 428
Dec 2025
383 383
Jan 2026
365 365
Feb 2026
270 270
Mar 2026
517 517
Apr 2026
822 822

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The facility time series page shows electric generation from all DER projects in the facility. If available, utility import data is stacked on top to show total facility use. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for another date range or time step, select your desired months and time step and press “Go”. Due to performance constraints, hourly data may only be displayed within a date range of up to one month in length.

To download data used to create the time series plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Times are shown in Eastern Time (ET) and are adjusted to reflect Daylight Saving Time (DST).

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.