Yellow 4 LLC - 843 State Route 11

Overview Yellow 4 LLC- 843 State Route 11- PV Systems

The facility monthly summary plot page shows electric generation from all DER projects in the facility, and utility import data if available. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for different dates, select your desired date range and press “Go”.

To download data used to create the monthly summary plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The facility monthly summary table shows electric generation from all DER projects in the facility, and utility import and facility electric load data if available.

To view data for different dates, select your desired date range and press “Go”.

To download data from the monthly summary table in CSV format, press the download button to the top right of the table.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Summary Table

Apr 2023 to Sep 2025
Electric Generation (kWh) Electric Utility Import (kWh) Facility Electric Load (kWh)
Total 9,175,880 9,175,880
Apr 2023
158,807 158,807
May 2023
440,111 440,111
Jun 2023
422,690 422,690
Jul 2023
409,345 409,345
Aug 2023
429,436 429,436
Sep 2023
351,947 351,947
Oct 2023
184,146 184,146
Nov 2023
121,554 121,554
Dec 2023
56,150 56,150
Jan 2024
64,477 64,477
Feb 2024
183,170 183,170
Mar 2024
232,255 232,255
Apr 2024
285,948 285,948
May 2024
371,706 371,706
Jun 2024
391,574 391,574
Jul 2024
577,856 577,856
Aug 2024
353,124 353,124
Sep 2024
390,784 390,784
Oct 2024
287,202 287,202
Nov 2024
140,617 140,617
Dec 2024
69,771 69,771
Jan 2025
117,547 117,547
Feb 2025
171,587 171,587
Mar 2025
298,220 298,220
Apr 2025
336,806 336,806
May 2025
388,516 388,516
Jun 2025
541,415 541,415
Jul 2025
571,434 571,434
Aug 2025
505,838 505,838
Sep 2025
321,848 321,848

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The facility time series page shows electric generation from all DER projects in the facility. If available, utility import data is stacked on top to show total facility use. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for another date range or time step, select your desired months and time step and press “Go”. Due to performance constraints, hourly data may only be displayed within a date range of up to one month in length.

To download data used to create the time series plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Times are shown in Eastern Time (ET) and are adjusted to reflect Daylight Saving Time (DST).

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.