SUNY Buffalo - 75 Webster Rd

Overview SUNY at Buffalo - 75 Webster Rd - PV Systems

The facility monthly summary plot page shows electric generation from all DER projects in the facility, and utility import data if available. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for different dates, select your desired date range and press “Go”.

To download data used to create the monthly summary plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The facility monthly summary table shows electric generation from all DER projects in the facility, and utility import and facility electric load data if available.

To view data for different dates, select your desired date range and press “Go”.

To download data from the monthly summary table in CSV format, press the download button to the top right of the table.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Summary Table

Feb 2023 to Dec 2025
Electric Generation (MWh) Electric Utility Import (MWh) Facility Electric Load (MWh)
Total 21,879 21,879
Feb 2023
401 401
Mar 2023
601 601
Apr 2023
827 827
May 2023
1,084 1,084
Jun 2023
884 884
Jul 2023
951 951
Aug 2023
838 838
Sep 2023
837 837
Oct 2023
510 510
Nov 2023
384 384
Dec 2023
185 185
Jan 2024
107 107
Feb 2024
498 498
Mar 2024
654 654
Apr 2024
668 668
May 2024
935 935
Jun 2024
870 870
Jul 2024
725 725
Aug 2024
299 299
Sep 2024
811 811
Oct 2024
725 725
Nov 2024
383 383
Dec 2024
188 188
Jan 2025
221 221
Feb 2025
217 217
Mar 2025
674 674
Apr 2025
751 751
May 2025
788 788
Jun 2025
962 962
Jul 2025
1,023 1,023
Aug 2025
921 921
Sep 2025
877 877
Oct 2025
687 687
Nov 2025
295 295
Dec 2025
96 96

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The facility time series page shows electric generation from all DER projects in the facility. If available, utility import data is stacked on top to show total facility use. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for another date range or time step, select your desired months and time step and press “Go”. Due to performance constraints, hourly data may only be displayed within a date range of up to one month in length.

To download data used to create the time series plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Times are shown in Eastern Time (ET) and are adjusted to reflect Daylight Saving Time (DST).

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.