Skip to Main Content
Search distributed energy resources in New York

Delaware River Solar - 466 Yellow Mills 1-3

The facility monthly summary plot page shows electric generation from all DER projects in the facility, and utility import data if available. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for different dates, select your desired date range and press “Go”.

To download data used to create the monthly summary plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The facility monthly summary table shows electric generation from all DER projects in the facility, and utility import and facility electric load data if available.

To view data for different dates, select your desired date range and press “Go”.

To download data from the monthly summary table in CSV format, press the download button to the top right of the table.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Summary Table

Jan 2023 to Apr 2026
Electric Generation (MWh) Electric Utility Import (MWh) Facility Electric Load (MWh)
Total 27,614 27,614
Jan 2023
187 187
Feb 2023
511 511
Mar 2023
724 724
Apr 2023
1,049 1,049
May 2023
1,235 1,235
Jun 2023
1,187 1,187
Jul 2023
1,248 1,248
Aug 2023
1,076 1,076
Sep 2023
1,114 1,114
Oct 2023
640 640
Nov 2023
530 530
Dec 2023
306 306
Jan 2024
169 169
Feb 2024
480 480
Mar 2024
677 677
Apr 2024
872 872
May 2024
1,220 1,220
Jun 2024
1,185 1,185
Jul 2024
1,048 1,048
Aug 2024
1,058 1,058
Sep 2024
1,077 1,077
Oct 2024
936 936
Nov 2024
257 257
Dec 2024
230 230
Jan 2025
262 262
Feb 2025
153 153
Mar 2025
738 738
Apr 2025
1,019 1,019
May 2025
942 942
Jun 2025
935 935
Jul 2025
1,341 1,341
Aug 2025
424 424
Sep 2025
56 56
Oct 2025
485 485
Nov 2025
261 261
Dec 2025
174 174
Jan 2026
202 202
Feb 2026
83 83
Mar 2026
634 634
Apr 2026
889 889

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The facility time series page shows electric generation from all DER projects in the facility. If available, utility import data is stacked on top to show total facility use. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for another date range or time step, select your desired months and time step and press “Go”. Due to performance constraints, hourly data may only be displayed within a date range of up to one month in length.

To download data used to create the time series plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Times are shown in Eastern Time (ET) and are adjusted to reflect Daylight Saving Time (DST).

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.