FPS Coxsackie Solar - 11016 State Route 9W

Overview FPS Coxsackie Solar LLC-11016 State Route 9W-PV Systems

The facility monthly summary plot page shows electric generation from all DER projects in the facility, and utility import data if available. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for different dates, select your desired date range and press “Go”.

To download data used to create the monthly summary plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The facility monthly summary table shows electric generation from all DER projects in the facility, and utility import and facility electric load data if available.

To view data for different dates, select your desired date range and press “Go”.

To download data from the monthly summary table in CSV format, press the download button to the top right of the table.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Summary Table

Dec 2022 to Apr 2026
Electric Generation (MWh) Electric Utility Import (MWh) Facility Electric Load (MWh)
Total 27,240 27,240
Dec 2022
296 296
Jan 2023
236 236
Feb 2023
435 435
Mar 2023
793 793
Apr 2023
884 884
May 2023
1,287 1,287
Jun 2023
784 784
Jul 2023
724 724
Aug 2023
946 946
Sep 2023
810 810
Oct 2023
556 556
Nov 2023
426 426
Dec 2023
233 233
Jan 2024
221 221
Feb 2024
618 618
Mar 2024
553 553
Apr 2024
736 736
May 2024
1,118 1,118
Jun 2024
1,106 1,106
Jul 2024
913 913
Aug 2024
825 825
Sep 2024
881 881
Oct 2024
789 789
Nov 2024
438 438
Dec 2024
248 248
Jan 2025
392 392
Feb 2025
446 446
Mar 2025
725 725
Apr 2025
860 860
May 2025
774 774
Jun 2025
770 770
Jul 2025
931 931
Aug 2025
1,144 1,144
Sep 2025
911 911
Oct 2025
603 603
Nov 2025
325 325
Dec 2025
291 291
Jan 2026
369 369
Feb 2026
353 353
Mar 2026
603 603
Apr 2026
888 888

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The facility time series page shows electric generation from all DER projects in the facility. If available, utility import data is stacked on top to show total facility use. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for another date range or time step, select your desired months and time step and press “Go”. Due to performance constraints, hourly data may only be displayed within a date range of up to one month in length.

To download data used to create the time series plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Times are shown in Eastern Time (ET) and are adjusted to reflect Daylight Saving Time (DST).

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.