Overview NSF Parma Site 2, LLC - 1682 Hilton Parma Corners Rd - PV Systems NSF Pharma 2 - 1682 Hilton Parma Corners Rd.

The facility monthly summary plot page shows electric generation from all DER projects in the facility, and utility import data if available. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for different dates, select your desired date range and press “Go”.

To download data used to create the monthly summary plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The facility monthly summary table shows electric generation from all DER projects in the facility, and utility import and facility electric load data if available.

To view data for different dates, select your desired date range and press “Go”.

To download data from the monthly summary table in CSV format, press the download button to the top right of the table.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Summary Table

May 2022 to Apr 2025
Electric Generation (kWh) Electric Utility Import (kWh) Facility Electric Load (kWh)
Total 12,526,777 12,526,777
May 2022
0 0
Jun 2022
26,411 26,411
Jul 2022
323,419 323,419
Aug 2022
554,847 554,847
Sep 2022
451,516 451,516
Oct 2022
463,277 463,277
Nov 2022
217,052 217,052
Dec 2022
170,686 170,686
Jan 2023
30,945 30,945
Feb 2023
281,113 281,113
Mar 2023
504,985 504,985
Apr 2023
680,999 680,999
May 2023
937,688 937,688
Jun 2023
802,301 802,301
Jul 2023
695,380 695,380
Aug 2023
803,727 803,727
Sep 2023
511,150 511,150
Oct 2023
0 0
Nov 2023
0 0
Dec 2023
0 0
Jan 2024
0 0
Feb 2024
0 0
Mar 2024
0 0
Apr 2024
88,054 88,054
May 2024
906,317 906,317
Jun 2024
841,257 841,257
Jul 2024
731,134 731,134
Aug 2024
738,223 738,223
Sep 2024
689,370 689,370
Oct 2024
529,220 529,220
Nov 2024
273,221 273,221
Dec 2024
105,340 105,340
Jan 2025
115,733 115,733
Feb 2025
53,411 53,411
Mar 2025
0 0
Apr 2025
0 0

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The facility time series page shows electric generation from all DER projects in the facility. If available, utility import data is stacked on top to show total facility use. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for another date range or time step, select your desired months and time step and press “Go”. Due to performance constraints, hourly data may only be displayed within a date range of up to one month in length.

To download data used to create the time series plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Times are shown in Eastern Time (ET) and are adjusted to reflect Daylight Saving Time (DST).

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.