Skip to Main Content
Search distributed energy resources in New York

Mt. Morris - Creek & Hendershot Solar II, LLC

Overview Mt. Morris - Creek & Hendershot Solar II, LLC

The facility monthly summary plot page shows electric generation from all DER projects in the facility, and utility import data if available. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for different dates, select your desired date range and press “Go”.

To download data used to create the monthly summary plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The facility monthly summary table shows electric generation from all DER projects in the facility, and utility import and facility electric load data if available.

To view data for different dates, select your desired date range and press “Go”.

To download data from the monthly summary table in CSV format, press the download button to the top right of the table.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Summary Table

Jun 2022 to Mar 2025
Electric Generation (kWh) Electric Utility Import (kWh) Facility Electric Load (kWh)
Total 6,344,722 6,344,722
Jun 2022
264,717 264,717
Jul 2022
351,935 351,935
Aug 2022
307,517 307,517
Sep 2022
212,266 212,266
Oct 2022
183,777 183,777
Nov 2022
116,090 116,090
Dec 2022
61,936 61,936
Jan 2023
49,884 49,884
Feb 2023
120,549 120,549
Mar 2023
194,381 194,381
Apr 2023
267,957 267,957
May 2023
368,302 368,302
Jun 2023
284,972 284,972
Jul 2023
325,864 325,864
Aug 2023
96,825 96,825
Sep 2023
257,684 257,684
Oct 2023
134,201 134,201
Nov 2023
97,131 97,131
Dec 2023
53,931 53,931
Jan 2024
60,386 60,386
Feb 2024
148,146 148,146
Mar 2024
213,047 213,047
Apr 2024
210,572 210,572
May 2024
306,859 306,859
Jun 2024
224,653 224,653
Jul 2024
280,649 280,649
Aug 2024
280,497 280,497
Sep 2024
256,503 256,503
Oct 2024
207,470 207,470
Nov 2024
52,427 52,427
Dec 2024
24,017 24,017
Jan 2025
84,516 84,516
Feb 2025
109,300 109,300
Mar 2025
135,760 135,760

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The facility time series page shows electric generation from all DER projects in the facility. If available, utility import data is stacked on top to show total facility use. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for another date range or time step, select your desired months and time step and press “Go”. Due to performance constraints, hourly data may only be displayed within a date range of up to one month in length.

To download data used to create the time series plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Times are shown in Eastern Time (ET) and are adjusted to reflect Daylight Saving Time (DST).

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.