Overview Macy's Albany

The facility monthly summary plot page shows electric generation from all DER projects in the facility, and utility import data if available. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for different dates, select your desired date range and press “Go”.

To download data used to create the monthly summary plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

NYSERDA requires projects to submit performance data for up to three years. This project has exceeded its required monitoring period, and NYSERDA is no longer gathering project performance data. Solar projects have an expected lifespan of at least 25 years, and energy storage projects have an expected lifespan of at least 10 to 15 years. For more information about the current status of this project, please contact the project owner.

The facility monthly summary table shows electric generation from all DER projects in the facility, and utility import and facility electric load data if available.

To view data for different dates, select your desired date range and press “Go”.

To download data from the monthly summary table in CSV format, press the download button to the top right of the table.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Summary Table

Nov 2014 to Apr 2026
Electric Generation (kWh) Electric Utility Import (kWh) Facility Electric Load (kWh)
Total 8,752,910 — 8,752,910
Nov 2014
8,375 — 8,375
Dec 2014
16,519 — 16,519
Jan 2015
21,927 — 21,927
Feb 2015
21,313 — 21,313
Mar 2015
68,259 — 68,259
Apr 2015
93,379 — 93,379
May 2015
98,821 — 98,821
Jun 2015
101,843 — 101,843
Jul 2015
120,010 — 120,010
Aug 2015
110,849 — 110,849
Sep 2015
86,109 — 86,109
Oct 2015
58,064 — 58,064
Nov 2015
42,879 — 42,879
Dec 2015
22,754 — 22,754
Jan 2016
33,797 — 33,797
Feb 2016
42,466 — 42,466
Mar 2016
83,541 — 83,541
Apr 2016
94,657 — 94,657
May 2016
101,348 — 101,348
Jun 2016
118,869 — 118,869
Jul 2016
115,913 — 115,913
Aug 2016
106,807 — 106,807
Sep 2016
90,607 — 90,607
Oct 2016
56,838 — 56,838
Nov 2016
37,506 — 37,506
Dec 2016
25,008 — 25,008
Jan 2017
27,535 — 27,535
Feb 2017
41,127 — 41,127
Mar 2017
63,959 — 63,959
Apr 2017
85,167 — 85,167
May 2017
93,437 — 93,437
Jun 2017
106,557 — 106,557
Jul 2017
105,588 — 105,588
Aug 2017
103,283 — 103,283
Sep 2017
86,124 — 86,124
Oct 2017
63,233 — 63,233
Nov 2017
36,463 — 36,463
Dec 2017
14,560 — 14,560
Jan 2018
27,596 — 27,596
Feb 2018
30,113 — 30,113
Mar 2018
27,711 — 27,711
Apr 2018
78,384 — 78,384
May 2018
98,268 — 98,268
Jun 2018
109,006 — 109,006
Jul 2018
117,839 — 117,839
Aug 2018
95,278 — 95,278
Sep 2018
68,894 — 68,894
Oct 2018
44,607 — 44,607
Nov 2018
23,896 — 23,896
Dec 2018
28,194 — 28,194
Jan 2019
28,113 — 28,113
Feb 2019
32,973 — 32,973
Mar 2019
68,765 — 68,765
Apr 2019
79,182 — 79,182
May 2019
87,687 — 87,687
Jun 2019
93,964 — 93,964
Jul 2019
104,203 — 104,203
Aug 2019
100,332 — 100,332
Sep 2019
79,573 — 79,573
Oct 2019
46,417 — 46,417
Nov 2019
33,535 — 33,535
Dec 2019
11,927 — 11,927
Jan 2020
30,883 — 30,883
Feb 2020
31,415 — 31,415
Mar 2020
66,225 — 66,225
Apr 2020
80,130 — 80,130
May 2020
100,115 — 100,115
Jun 2020
94,726 — 94,726
Jul 2020
105,973 — 105,973
Aug 2020
95,253 — 95,253
Sep 2020
81,472 — 81,472
Oct 2020
53,440 — 53,440
Nov 2020
35,428 — 35,428
Dec 2020
15,671 — 15,671
Jan 2021
15,362 — 15,362
Feb 2021
17,040 — 17,040
Mar 2021
83,866 — 83,866
Apr 2021
88,529 — 88,529
May 2021
99,124 — 99,124
Jun 2021
82,310 — 82,310
Jul 2021
89,022 — 89,022
Aug 2021
91,923 — 91,923
Sep 2021
77,019 — 77,019
Oct 2021
49,868 — 49,868
Nov 2021
38,757 — 38,757
Dec 2021
23,930 — 23,930
Jan 2022
19,907 — 19,907
Feb 2022
31,683 — 31,683
Mar 2022
62,248 — 62,248
Apr 2022
90,629 — 90,629
May 2022
114,046 — 114,046
Jun 2022
110,428 — 110,428
Jul 2022
112,613 — 112,613
Aug 2022
103,776 — 103,776
Sep 2022
75,338 — 75,338
Oct 2022
64,429 — 64,429
Nov 2022
43,809 — 43,809
Dec 2022
18,927 — 18,927
Jan 2023
16,852 — 16,852
Feb 2023
37,844 — 37,844
Mar 2023
58,926 — 58,926
Apr 2023
85,770 — 85,770
May 2023
115,528 — 115,528
Jun 2023
84,001 — 84,001
Jul 2023
96,535 — 96,535
Aug 2023
88,133 — 88,133
Sep 2023
74,047 — 74,047
Oct 2023
53,073 — 53,073
Nov 2023
38,399 — 38,399
Dec 2023
22,962 — 22,962
Jan 2024
13,459 — 13,459
Feb 2024
56,361 — 56,361
Mar 2024
57,078 — 57,078
Apr 2024
79,254 — 79,254
May 2024
98,431 — 98,431
Jun 2024
84,948 — 84,948
Jul 2024
99,738 — 99,738
Aug 2024
75,896 — 75,896
Sep 2024
75,201 — 75,201
Oct 2024
60,128 — 60,128
Nov 2024
32,254 — 32,254
Dec 2024
12,790 — 12,790
Jan 2025
26,586 — 26,586
Feb 2025
11,084 — 11,084
Mar 2025
59,965 — 59,965
Apr 2025
71,008 — 71,008
May 2025
66,955 — 66,955
Jun 2025
78,742 — 78,742
Jul 2025
89,505 — 89,505
Aug 2025
78,659 — 78,659
Sep 2025
40,494 — 40,494
Oct 2025
43,606 — 43,606
Nov 2025
22,960 — 22,960
Dec 2025
8,796 — 8,796
Jan 2026
11,244 — 11,244
Feb 2026
1,375 — 1,375
Mar 2026
40,439 — 40,439
Apr 2026
66,622 — 66,622

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

NYSERDA requires projects to submit performance data for up to three years. This project has exceeded its required monitoring period, and NYSERDA is no longer gathering project performance data. Solar projects have an expected lifespan of at least 25 years, and energy storage projects have an expected lifespan of at least 10 to 15 years. For more information about the current status of this project, please contact the project owner.

The facility time series page shows electric generation from all DER projects in the facility. If available, utility import data is stacked on top to show total facility use. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for another date range or time step, select your desired months and time step and press “Go”. Due to performance constraints, hourly data may only be displayed within a date range of up to one month in length.

To download data used to create the time series plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Times are shown in Eastern Time (ET) and are adjusted to reflect Daylight Saving Time (DST).

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

NYSERDA requires projects to submit performance data for up to three years. This project has exceeded its required monitoring period, and NYSERDA is no longer gathering project performance data. Solar projects have an expected lifespan of at least 25 years, and energy storage projects have an expected lifespan of at least 10 to 15 years. For more information about the current status of this project, please contact the project owner.