Skip to Main Content
Search distributed energy resources in New York

Skidmore College

Overview Skidmore College

The facility monthly summary plot page shows electric generation from all DER projects in the facility, and utility import data if available. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for different dates, select your desired date range and press “Go”.

To download data used to create the monthly summary plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

NYSERDA requires projects to submit performance data for up to three years. This project has exceeded its required monitoring period, and NYSERDA is no longer gathering project performance data. Solar projects have an expected lifespan of at least 25 years, and energy storage projects have an expected lifespan of at least 10 to 15 years. For more information about the current status of this project, please contact the project owner.

The facility monthly summary table shows electric generation from all DER projects in the facility, and utility import and facility electric load data if available.

To view data for different dates, select your desired date range and press “Go”.

To download data from the monthly summary table in CSV format, press the download button to the top right of the table.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Summary Table

Aug 2014 to Apr 2026
Electric Generation (kWh) Electric Utility Import (kWh) Facility Electric Load (kWh)
Total 27,292,701 — 27,292,701
Aug 2014
281,759 — 281,759
Sep 2014
264,293 — 264,293
Oct 2014
173,608 — 173,608
Nov 2014
125,662 — 125,662
Dec 2014
74,092 — 74,092
Jan 2015
78,230 — 78,230
Feb 2015
2,748 — 2,748
Mar 2015
191,024 — 191,024
Apr 2015
270,077 — 270,077
May 2015
328,315 — 328,315
Jun 2015
272,423 — 272,423
Jul 2015
268,454 — 268,454
Aug 2015
307,836 — 307,836
Sep 2015
273,449 — 273,449
Oct 2015
200,330 — 200,330
Nov 2015
161,835 — 161,835
Dec 2015
66,174 — 66,174
Jan 2016
130,343 — 130,343
Feb 2016
168,481 — 168,481
Mar 2016
249,731 — 249,731
Apr 2016
287,352 — 287,352
May 2016
285,902 — 285,902
Jun 2016
325,994 — 325,994
Jul 2016
315,494 — 315,494
Aug 2016
284,465 — 284,465
Sep 2016
274,295 — 274,295
Oct 2016
193,271 — 193,271
Nov 2016
145,231 — 145,231
Dec 2016
76,120 — 76,120
Jan 2017
105,540 — 105,540
Feb 2017
145,925 — 145,925
Mar 2017
239,472 — 239,472
Apr 2017
248,080 — 248,080
May 2017
262,027 — 262,027
Jun 2017
278,021 — 278,021
Jul 2017
230,045 — 230,045
Aug 2017
298,446 — 298,446
Sep 2017
269,175 — 269,175
Oct 2017
211,737 — 211,737
Nov 2017
132,692 — 132,692
Dec 2017
41,772 — 41,772
Jan 2018
65,878 — 65,878
Feb 2018
103,499 — 103,499
Mar 2018
195,407 — 195,407
Apr 2018
229,640 — 229,640
May 2018
285,941 — 285,941
Jun 2018
284,071 — 284,071
Jul 2018
319,177 — 319,177
Aug 2018
261,402 — 261,402
Sep 2018
208,859 — 208,859
Oct 2018
148,744 — 148,744
Nov 2018
95,438 — 95,438
Dec 2018
83,074 — 83,074
Jan 2019
91,290 — 91,290
Feb 2019
125,405 — 125,405
Mar 2019
259,125 — 259,125
Apr 2019
244,839 — 244,839
May 2019
235,741 — 235,741
Jun 2019
219,783 — 219,783
Jul 2019
302,603 — 302,603
Aug 2019
310,651 — 310,651
Sep 2019
234,709 — 234,709
Oct 2019
96,240 — 96,240
Nov 2019
108,980 — 108,980
Dec 2019
52,240 — 52,240
Jan 2020
97,040 — 97,040
Feb 2020
131,390 — 131,390
Mar 2020
237,060 — 237,060
Apr 2020
237,249 — 237,249
May 2020
314,050 — 314,050
Jun 2020
311,650 — 311,650
Jul 2020
308,060 — 308,060
Aug 2020
295,640 — 295,640
Sep 2020
259,220 — 259,220
Oct 2020
187,380 — 187,380
Nov 2020
134,080 — 134,080
Dec 2020
59,180 — 59,180
Jan 2021
92,340 — 92,340
Feb 2021
111,791 — 111,791
Mar 2021
294,120 — 294,120
Apr 2021
242,230 — 242,230
May 2021
272,640 — 272,640
Jun 2021
252,470 — 252,470
Jul 2021
227,363 — 227,363
Aug 2021
225,806 — 225,806
Sep 2021
164,825 — 164,825
Oct 2021
152,332 — 152,332
Nov 2021
128,530 — 128,530
Dec 2021
60,915 — 60,915
Jan 2022
95,500 — 95,500
Feb 2022
123,080 — 123,080
Mar 2022
204,300 — 204,300
Apr 2022
242,754 — 242,754
May 2022
308,740 — 308,740
Jun 2022
287,730 — 287,730
Jul 2022
279,515 — 279,515
Aug 2022
236,700 — 236,700
Sep 2022
204,560 — 204,560
Oct 2022
198,390 — 198,390
Nov 2022
144,340 — 144,340
Dec 2022
71,600 — 71,600
Jan 2023
68,010 — 68,010
Feb 2023
134,800 — 134,800
Mar 2023
216,930 — 216,930
Apr 2023
243,990 — 243,990
May 2023
308,784 — 308,784
Jun 2023
238,481 — 238,481
Jul 2023
268,850 — 268,850
Aug 2023
240,477 — 240,477
Sep 2023
224,016 — 224,016
Oct 2023
157,517 — 157,517
Nov 2023
129,986 — 129,986
Dec 2023
43,101 — 43,101
Jan 2024
38,888 — 38,888
Feb 2024
194,167 — 194,167
Mar 2024
201,852 — 201,852
Apr 2024
196,153 — 196,153
May 2024
262,753 — 262,753
Jun 2024
273,407 — 273,407
Jul 2024
273,079 — 273,079
Aug 2024
232,410 — 232,410
Sep 2024
242,164 — 242,164
Oct 2024
173,047 — 173,047
Nov 2024
105,698 — 105,698
Dec 2024
52,098 — 52,098
Jan 2025
100,537 — 100,537
Feb 2025
87,621 — 87,621
Mar 2025
223,374 — 223,374
Apr 2025
245,430 — 245,430
May 2025
202,525 — 202,525
Jun 2025
243,726 — 243,726
Jul 2025
252,940 — 252,940
Aug 2025
247,060 — 247,060
Sep 2025
186,630 — 186,630
Oct 2025
178,844 — 178,844
Nov 2025
99,702 — 99,702
Dec 2025
25,098 — 25,098
Jan 2026
46,703 — 46,703
Feb 2026
65,769 — 65,769
Mar 2026
131,576 — 131,576
Apr 2026
137,283 — 137,283

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

NYSERDA requires projects to submit performance data for up to three years. This project has exceeded its required monitoring period, and NYSERDA is no longer gathering project performance data. Solar projects have an expected lifespan of at least 25 years, and energy storage projects have an expected lifespan of at least 10 to 15 years. For more information about the current status of this project, please contact the project owner.

The facility time series page shows electric generation from all DER projects in the facility. If available, utility import data is stacked on top to show total facility use. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for another date range or time step, select your desired months and time step and press “Go”. Due to performance constraints, hourly data may only be displayed within a date range of up to one month in length.

To download data used to create the time series plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Times are shown in Eastern Time (ET) and are adjusted to reflect Daylight Saving Time (DST).

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

NYSERDA requires projects to submit performance data for up to three years. This project has exceeded its required monitoring period, and NYSERDA is no longer gathering project performance data. Solar projects have an expected lifespan of at least 25 years, and energy storage projects have an expected lifespan of at least 10 to 15 years. For more information about the current status of this project, please contact the project owner.