Skip to Main Content
Search distributed energy resources in New York

Equinix

Overview Equinix - 401 Fieldcrest Drive #1

The facility monthly summary plot page shows electric generation from all DER projects in the facility, and utility import data if available. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for different dates, select your desired date range and press “Go”.

To download data used to create the monthly summary plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The facility monthly summary table shows electric generation from all DER projects in the facility, and utility import and facility electric load data if available.

To view data for different dates, select your desired date range and press “Go”.

To download data from the monthly summary table in CSV format, press the download button to the top right of the table.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Summary Table

Sep 2020 to Aug 2023
Electric Generation (kWh) Electric Utility Import (kWh) Facility Electric Load (kWh)
Total 19,237,217 19,237,217
Sep 2020
256,708 256,708
Oct 2020
586,058 586,058
Nov 2020
590,573 590,573
Dec 2020
515,560 515,560
Jan 2021
625,714 625,714
Feb 2021
444,590 444,590
Mar 2021
532,522 532,522
Apr 2021
562,944 562,944
May 2021
642,697 642,697
Jun 2021
539,281 539,281
Jul 2021
631,883 631,883
Aug 2021
646,037 646,037
Sep 2021
612,069 612,069
Oct 2021
539,075 539,075
Nov 2021
591,259 591,259
Dec 2021
619,607 619,607
Jan 2022
621,071 621,071
Feb 2022
491,387 491,387
Mar 2022
616,256 616,256
Apr 2022
592,199 592,199
May 2022
600,013 600,013
Jun 2022
548,058 548,058
Jul 2022
545,970 545,970
Aug 2022
421,207 421,207
Sep 2022
438,791 438,791
Oct 2022
579,915 579,915
Nov 2022
529,370 529,370
Dec 2022
473,652 473,652
Jan 2023
526,176 526,176
Feb 2023
473,236 473,236
Mar 2023
491,104 491,104
Apr 2023
508,605 508,605
May 2023
471,959 471,959
Jun 2023
399,703 399,703
Jul 2023
477,108 477,108
Aug 2023
494,862 494,862

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The facility time series page shows electric generation from all DER projects in the facility. If available, utility import data is stacked on top to show total facility use. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for another date range or time step, select your desired months and time step and press “Go”. Due to performance constraints, hourly data may only be displayed within a date range of up to one month in length.

To download data used to create the time series plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Times are shown in Eastern Time (ET) and are adjusted to reflect Daylight Saving Time (DST).

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.