Wawayanda Solar - Mount Orange Road - PV Systems

Overview Wawayanda Solar - Mount Orange Road - PV Systems

The facility monthly summary plot page shows electric generation from all DER projects in the facility, and utility import data if available. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for different dates, select your desired date range and press “Go”.

To download data used to create the monthly summary plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The facility monthly summary table shows electric generation from all DER projects in the facility, and utility import and facility electric load data if available.

To view data for different dates, select your desired date range and press “Go”.

To download data from the monthly summary table in CSV format, press the download button to the top right of the table.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Summary Table

Jul 2020 to Apr 2026
Electric Generation (kWh) Electric Utility Import (kWh) Facility Electric Load (kWh)
Total 6,461,219 6,461,219
Jul 2020
4,461 4,461
Aug 2020
121,450 121,450
Sep 2020
2,525 2,525
Oct 2020
0 0
Nov 2020
3,856 3,856
Dec 2020
39 39
Jan 2021
52,665 52,665
Feb 2021
50,661 50,661
Mar 2021
131,101 131,101
Apr 2021
123,434 123,434
May 2021
137,823 137,823
Jun 2021
141,485 141,485
Jul 2021
128,835 128,835
Aug 2021
124,110 124,110
Sep 2021
115,808 115,808
Oct 2021
78,677 78,677
Nov 2021
75,699 75,699
Dec 2021
50,177 50,177
Jan 2022
55,356 55,356
Feb 2022
78,824 78,824
Mar 2022
53,543 53,543
Apr 2022
105,324 105,324
May 2022
130,559 130,559
Jun 2022
145,773 145,773
Jul 2022
156,823 156,823
Aug 2022
139,209 139,209
Sep 2022
115,502 115,502
Oct 2022
96,603 96,603
Nov 2022
76,659 76,659
Dec 2022
48,641 48,641
Jan 2023
44,861 44,861
Feb 2023
76,709 76,709
Mar 2023
108,588 108,588
Apr 2023
119,770 119,770
May 2023
130,059 130,059
Jun 2023
119,337 119,337
Jul 2023
127,808 127,808
Aug 2023
126,113 126,113
Sep 2023
107,864 107,864
Oct 2023
80,328 80,328
Nov 2023
84,412 84,412
Dec 2023
42,138 42,138
Jan 2024
31,806 31,806
Feb 2024
91,090 91,090
Mar 2024
110,115 110,115
Apr 2024
108,266 108,266
May 2024
138,124 138,124
Jun 2024
145,186 145,186
Jul 2024
145,416 145,416
Aug 2024
124,686 124,686
Sep 2024
115,962 115,962
Oct 2024
125,533 125,533
Nov 2024
84,263 84,263
Dec 2024
52,110 52,110
Jan 2025
49,097 49,097
Feb 2025
71,022 71,022
Mar 2025
119,510 119,510
Apr 2025
120,820 120,820
May 2025
106,119 106,119
Jun 2025
123,888 123,888
Jul 2025
140,384 140,384
Aug 2025
146,877 146,877
Sep 2025
123,123 123,123
Oct 2025
100,072 100,072
Nov 2025
51,885 51,885
Dec 2025
36,195 36,195
Jan 2026
38,735 38,735
Feb 2026
43,190 43,190
Mar 2026
78,763 78,763
Apr 2026
125,371 125,371

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The facility time series page shows electric generation from all DER projects in the facility. If available, utility import data is stacked on top to show total facility use. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for another date range or time step, select your desired months and time step and press “Go”. Due to performance constraints, hourly data may only be displayed within a date range of up to one month in length.

To download data used to create the time series plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Times are shown in Eastern Time (ET) and are adjusted to reflect Daylight Saving Time (DST).

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.