Howell Solar

Overview Howell Solar - 80953

The facility monthly summary plot page shows electric generation from all DER projects in the facility, and utility import data if available. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for different dates, select your desired date range and press “Go”.

To download data used to create the monthly summary plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The facility monthly summary table shows electric generation from all DER projects in the facility, and utility import and facility electric load data if available.

To view data for different dates, select your desired date range and press “Go”.

To download data from the monthly summary table in CSV format, press the download button to the top right of the table.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Summary Table

Feb 2020 to Apr 2026
Electric Generation (kWh) Electric Utility Import (kWh) Facility Electric Load (kWh)
Total 15,646,494 15,646,494
Feb 2020
91,782 91,782
Mar 2020
267,280 267,280
Apr 2020
274,138 274,138
May 2020
355,064 355,064
Jun 2020
321,877 321,877
Jul 2020
279,997 279,997
Aug 2020
369,441 369,441
Sep 2020
361,674 361,674
Oct 2020
264,831 264,831
Nov 2020
184,006 184,006
Dec 2020
121,842 121,842
Jan 2021
165,424 165,424
Feb 2021
133,445 133,445
Mar 2021
335,456 335,456
Apr 2021
337,411 337,411
May 2021
350,472 350,472
Jun 2021
347,362 347,362
Jul 2021
255,717 255,717
Aug 2021
287,359 287,359
Sep 2021
276,955 276,955
Oct 2021
177,838 177,838
Nov 2021
69,974 69,974
Dec 2021
28,378 28,378
Jan 2022
51,307 51,307
Feb 2022
30,787 30,787
Mar 2022
38,612 38,612
Apr 2022
45,593 45,593
May 2022
124,559 124,559
Jun 2022
255,353 255,353
Jul 2022
427,415 427,415
Aug 2022
374,209 374,209
Sep 2022
299,335 299,335
Oct 2022
216,735 216,735
Nov 2022
196,639 196,639
Dec 2022
132,805 132,805
Jan 2023
123,962 123,962
Feb 2023
209,920 209,920
Mar 2023
157,562 157,562
Apr 2023
293,384 293,384
May 2023
381,346 381,346
Jun 2023
207,819 207,819
Jul 2023
172,179 172,179
Aug 2023
171,804 171,804
Sep 2023
123,209 123,209
Oct 2023
107,045 107,045
Nov 2023
136,840 136,840
Dec 2023
59,956 59,956
Jan 2024
16,219 16,219
Feb 2024
105,818 105,818
Mar 2024
131,388 131,388
Apr 2024
158,826 158,826
May 2024
196,695 196,695
Jun 2024
184,473 184,473
Jul 2024
281,919 281,919
Aug 2024
299,498 299,498
Sep 2024
261,859 261,859
Oct 2024
300,002 300,002
Nov 2024
186,771 186,771
Dec 2024
36,145 36,145
Jan 2025
51,585 51,585
Feb 2025
157,293 157,293
Mar 2025
307,305 307,305
Apr 2025
315,406 315,406
May 2025
232,751 232,751
Jun 2025
236,671 236,671
Jul 2025
299,281 299,281
Aug 2025
249,016 249,016
Sep 2025
274,623 274,623
Oct 2025
310,715 310,715
Nov 2025
185,441 185,441
Dec 2025
114,165 114,165
Jan 2026
103,478 103,478
Feb 2026
90,523 90,523
Mar 2026
219,558 219,558
Apr 2026
342,971 342,971

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The facility time series page shows electric generation from all DER projects in the facility. If available, utility import data is stacked on top to show total facility use. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for another date range or time step, select your desired months and time step and press “Go”. Due to performance constraints, hourly data may only be displayed within a date range of up to one month in length.

To download data used to create the time series plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Times are shown in Eastern Time (ET) and are adjusted to reflect Daylight Saving Time (DST).

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.