Skip to Main Content
Search distributed energy resources in New York

Luna Park Apartments - Building 5

Overview Luna Park Building 5

The facility monthly summary plot page shows electric generation from all DER projects in the facility, and utility import data if available. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for different dates, select your desired date range and press “Go”.

To download data used to create the monthly summary plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The facility monthly summary table shows electric generation from all DER projects in the facility, and utility import and facility electric load data if available.

To view data for different dates, select your desired date range and press “Go”.

To download data from the monthly summary table in CSV format, press the download button to the top right of the table.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Summary Table

Sep 2019 to Aug 2023
Electric Generation (kWh) Electric Utility Import (kWh) Facility Electric Load (kWh)
Total 2,027,252 2,298,490 4,325,742
Sep 2019
26,754 52,646 79,400
Oct 2019
41,400 59,650 101,049
Nov 2019
39,607 48,235 87,842
Dec 2019
48,276 54,318 102,595
Jan 2020
50,681 51,674 102,355
Feb 2020
45,325 43,478 88,802
Mar 2020
56,483 45,636 102,119
Apr 2020
53,575 43,378 96,954
May 2020
52,580 40,960 93,540
Jun 2020
43,891 49,816 93,708
Jul 2020
37,063 67,344 104,407
Aug 2020
39,301 63,378 102,680
Sep 2020
40,208 54,026 94,234
Oct 2020
37,252 60,218 97,471
Nov 2020
42,841 53,596 96,437
Dec 2020
42,180 61,096 103,276
Jan 2021
39,021 63,429 102,450
Feb 2021
34,082 56,952 91,034
Mar 2021
36,877 58,728 95,604
Apr 2021
37,687 51,245 88,932
May 2021
44,834 44,647 89,481
Jun 2021
46,433 42,958 89,390
Jul 2021
44,680 50,298 94,978
Aug 2021
41,509 56,284 97,792
Sep 2021
39,483 51,958 91,441
Oct 2021
34,622 56,826 91,448
Nov 2021
33,358 57,600 90,959
Dec 2021
47,835 47,663 95,498
Jan 2022
46,458 48,751 95,209
Feb 2022
41,309 41,548 82,857
Mar 2022
50,494 37,893 88,387
Apr 2022
35,016 25,494 60,510
May 2022
41,971 35,876 77,847
Jun 2022
37,060 46,302 83,361
Jul 2022
39,731 51,886 91,616
Aug 2022
31,953 60,200 92,153
Sep 2022
41,880 41,492 83,372
Oct 2022
42,995 36,429 79,424
Nov 2022
46,159 37,154 83,313
Dec 2022
50,807 37,910 88,717
Jan 2023
49,407 39,716 89,123
Feb 2023
44,856 33,552 78,408
Mar 2023
46,138 39,503 85,640
Apr 2023
46,614 31,444 78,058
May 2023
45,648 31,614 77,262
Jun 2023
41,068 37,157 78,226
Jul 2023
35,534 52,408 87,941
Aug 2023
34,318 44,126 78,444

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The facility time series page shows electric generation from all DER projects in the facility. If available, utility import data is stacked on top to show total facility use. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for another date range or time step, select your desired months and time step and press “Go”. Due to performance constraints, hourly data may only be displayed within a date range of up to one month in length.

To download data used to create the time series plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Times are shown in Eastern Time (ET) and are adjusted to reflect Daylight Saving Time (DST).

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.