Memorial Sloan Kettering Cancer Center ZUCKERMAN BUILDING
This page shows facility, project, and distributed energy resource details. Click on the solid bars to show or hide details.
This page shows facility, project, and distributed energy resource details. Click on the solid bars to show or hide details.
Facility Details
| Category | Health Care (Inpatient): Hospital |
|---|---|
| Electric Utility | Consolidated Edison |
| Gas Utility | Consolidated Edison |
| NYISO Zone | J - New York City |
-
Program CHP Developer/Installer Santapaul Corporation 
Data Monitoring Feb 2024 – Dec 2026 NYSERDA Contract Name Memorial Sloan Kettering Cancer Center ZUCKERMAN BUILDING Contracted Capacity 2220 kW NYSERDA-funded Heat Recovery Loads Met Domestic Hot Water (DHW) Project Documentation
-
Unit Manufacturer Centrica Business Solutions Unit Model ER555UL HW Elec. Gen. Rating per Unit 555 kW Thermal Gen. Rating per Unit 2245.6 MBtu/h No. of Units 4 No. of Prime Movers 1 Primary Fuel Natural Gas Prime Mover Reciprocating Engine Generator Synchronous Generator Rated Electric Efficiency (% HHV) 34.05 Rated CHP Efficiency (% HHV) 79.01
-