Skip to Main Content
Search distributed energy resources in New York

Lakeside Towers

This page shows facility, project, and distributed energy resource details. Click on the solid bars to show or hide details.

View Facility in Google Maps
220-55 46th Avenue
Flushing, NY 11361
CHP
125 kW
780 MBtu/h

Facility Details

View Data
CategoryResidential: Multifamily
Electric UtilityConsolidated Edison
Gas UtilityConsolidated Edison
NYISO ZoneJ - New York City
  • Combined Heat and Power (CHP) Project

    Elec. Gen. Capacity
    125 kW
    Heat Gen. Capacity
    780,000 Btu/h
    View Plots and Tables View Data
    ProgramCHP
    Developer/InstallerTecogen, Inc.External link (opens in new window)
    Data MonitoringJan 2020 – Dec 2023
    NYSERDA Contract NameLakeside Towers
    Contracted Capacity125 kW
    ConEd Target Zone
    Heat Recovery Loads MetDomestic Hot Water (DHW)
    System Redundancy (N+1)
    Black-Start/Islanding Capable
    Grid Export Capable
    • Unit Manufacturer Tecogen Inc.
      Unit Model INV-125 e+
      Elec. Gen. Rating 125 kW
      Thermal Gen. Rating 780 MBtu/h
      No. of Units 1
      No. of Prime Movers1
      Primary FuelNatural Gas
      Prime MoverReciprocating Engine
      GeneratorInverter
      Rated Electric Efficiency (% HHV)28.4
      Rated CHP Efficiency (% HHV)80.9