Sparrow Bush NY 1 & 2 - 152 Peenpack Trail
This page shows facility, project, and distributed energy resource details. Click on the solid bars to show or hide details.
This page shows facility, project, and distributed energy resource details. Click on the solid bars to show or hide details.
Facility Details
| Category | Offsite Resource: Solar Farm |
|---|---|
| Electric Utility | Orange and Rockland Utilities |
| NYISO Zone | G - Hudson Valley |
-
Program Solar PV Developer/Installer Nexamp 
Data Monitoring Apr 2023 – Apr 2026 NYSERDA Contract Name Sparrow Bush NY 1, LLC - 152 W Peenpack Trail - PV Systems Contracted Capacity 2807.27 kW NYSERDA-funded Project Documentation
-
Elec. Gen. Rating 2807.3 kW No. of Units 1 No. of Prime Movers 1 Primary Fuel Solar Prime Mover Solar PV Location Outdoor - Ground Level/Mounted Generator Inverter Tilt 25.0 Azimuth 180.0
-
-
Program Solar PV Developer/Installer Nexamp 
Data Monitoring Apr 2023 – Apr 2026 NYSERDA Contract Name Sparrow Bush NY 2, LLC - 152 W Peenpack Trail - PV Systems Contracted Capacity 1419.715 kW NYSERDA-funded Project Documentation
-
Elec. Gen. Rating 1419.7 kW No. of Units 1 No. of Prime Movers 1 Primary Fuel Solar Prime Mover Solar PV Location Outdoor - Ground Level/Mounted Generator Inverter Tilt 25.0 Azimuth 180.0
-