Skip to Main Content
Search distributed energy resources in New York

1199 Housing

This page shows facility, project, and distributed energy resource details. Click on the solid bars to show or hide details.

View Facility in Google Maps
2130 1st Ave
New York, NY 10029
CHP
1,855 kW
9.9 MMBtu/h

Facility Details

View Data
CategoryResidential: Multifamily
Electric UtilityConsolidated Edison
Gas UtilityConsolidated Edison
NYISO ZoneJ - New York City
    • Combined Heat and Power (CHP) Project

      Elec. Gen. Capacity
      530 kW
      Heat Gen. Capacity
      2,824 MBtu/h
      View Plots and Tables View Data
      ProgramCHP
      Developer/Installer2G Energy, Inc.External link (opens in new window)
      Data MonitoringDec 2022 – Mar 2025
      NYSERDA Contract Name2070-2080 Housing Corporation
      Contracted Capacity530 kW
      NYSERDA-funded
      • Unit Manufacturer 2G Energy, Inc.
        Unit Model patruus265NG
        Elec. Gen. Rating per Unit 265 kW
        Thermal Gen. Rating per Unit 1412 MBtu/h
        No. of Units 2
        No. of Prime Movers1
        Primary FuelNatural Gas
        Prime MoverReciprocating Engine
        GeneratorSynchronous Generator
        Rated Electric Efficiency (% HHV)31.4
        Rated CHP Efficiency (% HHV)81.4
    • Combined Heat and Power (CHP) Project

      Elec. Gen. Capacity
      795 kW
      Heat Gen. Capacity
      4,236 MBtu/h
      View Plots and Tables View Data
      ProgramCHP
      Developer/Installer2G Energy, Inc.External link (opens in new window)
      Data MonitoringDec 2022 – Mar 2025
      NYSERDA Contract Name2100 1st Avenue Building BC
      Contracted Capacity795 kW
      NYSERDA-funded
      • Unit Manufacturer 2G Energy, Inc.
        Unit Model patruus265NG
        Elec. Gen. Rating per Unit 265 kW
        Thermal Gen. Rating per Unit 1412 MBtu/h
        No. of Units 3
        No. of Prime Movers1
        Primary FuelNatural Gas
        Prime MoverReciprocating Engine
        GeneratorSynchronous Generator
        Rated Electric Efficiency (% HHV)31.4
        Rated CHP Efficiency (% HHV)81.4
    • Combined Heat and Power (CHP) Project

      Elec. Gen. Capacity
      530 kW
      Heat Gen. Capacity
      2,824 MBtu/h
      View Plots and Tables View Data
      ProgramCHP
      Developer/Installer2G Energy, Inc.External link (opens in new window)
      Data MonitoringDec 2022 – Mar 2025
      NYSERDA Contract NameBuilding D
      Contracted Capacity530 kW
      NYSERDA-funded
      • Unit Manufacturer 2G Energy, Inc.
        Unit Model patruus265NG
        Elec. Gen. Rating per Unit 265 kW
        Thermal Gen. Rating per Unit 1412 MBtu/h
        No. of Units 2
        No. of Prime Movers1
        Primary FuelNatural Gas
        Prime MoverReciprocating Engine
        GeneratorSynchronous Generator
        Rated Electric Efficiency (% HHV)31.4
        Rated CHP Efficiency (% HHV)81.4