Borrego Solar Systems - 2668 Redman Road
This page shows facility, project, and distributed energy resource details. Click on the solid bars to show or hide details.
This page shows facility, project, and distributed energy resource details. Click on the solid bars to show or hide details.
Facility Details
| Category | Offsite Resource: Solar Farm |
|---|---|
| Electric Utility | National Grid - Upstate NY (Niagara Mohawk) |
| NYISO Zone | B - Genessee |
-
Program Solar PV Developer/Installer AES Distributed Energy Data Monitoring Aug 2022 – Aug 2024 NYSERDA Contract Name Borrego Solar Systems, Inc. - 2668 Redman Rd North - PV Systems Contracted Capacity 1948.32 kW NYSERDA-funded Project Documentation
-
Elec. Gen. Rating 1948.3 kW No. of Units 1 No. of Prime Movers 1 Primary Fuel Solar Prime Mover Solar PV Location Outdoor - Ground Level/Mounted Generator Inverter Tilt 0.0 Azimuth 0.0
-
-
Program Solar PV Developer/Installer AES Distributed Energy Data Monitoring Aug 2022 – Nov 2024 NYSERDA Contract Name Borrego Solar Systems, Inc. - 2668 Redman Rd South - PV Systems Contracted Capacity 6642 kW NYSERDA-funded Project Documentation
-
Elec. Gen. Rating 6642 kW No. of Units 1 No. of Prime Movers 1 Primary Fuel Solar Prime Mover Solar PV Location Outdoor - Ground Level/Mounted Generator Inverter Tilt 0.0 Azimuth 0.0
-