Facility Details
| Category | Offsite Resource: Solar Farm |
|---|---|
| Electric Utility | Central Hudson Gas and Electric |
| NYISO Zone | H - Millwood |
-
-
Program Solar PV Developer/Installer Generate Capital, Inc. 
Data Monitoring Mar 2021 – Apr 2026 NYSERDA Contract Name Salt Point Solar, LLC - 525 Salt Point Turnpike - PV Systems Contracted Capacity 2952.6 kW NYSERDA-funded Project Documentation
-
Elec. Gen. Rating 2952.3 kW No. of Units 1 Primary Fuel Solar Prime Mover Solar PV Location Outdoor - Ground Level/Mounted Generator Inverter Tilt 30.0 Azimuth 180.0
-
-
Program Energy Storage Developer/Installer Cypress Creek Renewables Data Monitoring Mar 2021 – Apr 2026 NYSERDA Contract Name Salt Point Contracted Capacity 2000 kW Commercial Operation Date December, 2019 NYSERDA-funded -
Unit Model IHI - 2MW Electric Stg. Disch. Rate 2000 kW Electric Stg. Energy Cap. 4070 kWh No. of Units 1 ESS Type Battery: Lithium Ion (LI-ION) Location Outdoor - Ground Level/Mounted
-
-