273 Finchville Turnpike
This page shows facility, project, and distributed energy resource details. Click on the solid bars to show or hide details.
This page shows facility, project, and distributed energy resource details. Click on the solid bars to show or hide details.
Facility Details
| Category | Offsite Resource: Solar Farm |
|---|---|
| Electric Utility | Orange and Rockland Utilities |
| NYISO Zone | G - Hudson Valley |
-
-
Program Solar PV Developer/Installer AES Distributed Energy Data Monitoring Jul 2021 – Nov 2024 NYSERDA Contract Name 249 Finchville Turnpike - PV Systems Contracted Capacity 6814.13 kW NYSERDA-funded Project Documentation
-
Elec. Gen. Rating 6814.1 kW No. of Units 1 No. of Prime Movers 1 Primary Fuel Solar Prime Mover Solar PV Location Outdoor - Ground Level/Mounted Generator Inverter Tilt 25.0 Azimuth 210.0
-
-
Program Energy Storage Developer/Installer Borrego Solar (formerly SEC Newco, LLC) 
Data Monitoring Sep 2021 – Dec 2024 NYSERDA Contract Name Finchville Contracted Capacity 1920 kW NYSERDA-funded -
Electric Stg. Disch. Rate 1920 kW Electric Stg. Energy Cap. 4360 kWh No. of Units 1 ESS Type Battery: Lithium Ion (LI-ION) Location Outdoor - Ground Level/Mounted
-
-